Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Of Connecting Road Of Sriniketan Road Near Ganguly Health Centre Under The Planning Area Of Sriniketan Santiniketan Development Authority At Bolpur, Birbhum, West Bengal
|
| Description |
Widening And Strengthening Of Connecting Road Of Sriniketan Road Near Ganguly Health Centre Under The Planning Area Of Sriniketan Santiniketan Development Authority&Amp#X0d
At Bolpur, Birbhum, West Bengal.&Amp#X0d
|
| Organisation | SRINIKETAN SANTINIKETAN DEVELOPMENT AUTHORITY | State Govt. and UT |
| Tender Id | 2025_SSDA_981751_1 |
|
Reference Number |
NIT-20 OF 2025-26 |
| Tender Fee | 0 |
| EMD | 1.55 Lakh |
| Tender Value | |
| Place | SSDA, BOLPUR |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2394545 |
| Start Date | January 07, 2026 16:30 |
| End Date |
Expired
21/01/2026
Expired 144 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of kutcha approach road to coal stock junction and existing wbm road from check post 4 to cement concrete road at gouri pouni expansion ocm under gouri pouni sub area
Strengthening of kutcha approach road to coal stock junction and existing wbm road from check post 4 to cement concrete road at gouri pouni expansion ocm under gouri pouni sub area
Read moreWork of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the industrial area (phase-1) under the jurisdiction of edd- chandauli pursuant to the bp 2026-27 (on semi turn-key basis).
Work of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the industrial area (phase-1) under the jurisdiction of edd- chandauli pursuant to the bp 2026-27 (on semi turn-key basis).
Read moreRepairing, upgradation and miscellaneous works at the v.i.p guest house under ghugus sub area of wani area.
Repairing, upgradation and miscellaneous works at the v.i.p guest house under ghugus sub area of wani area.
Read moreWork of substation earthing, overhauling of power tf installation of double-circuit underground cables, and construction/strengthening of 11k ht/lt lines within the industrial area(phase-2) under the jurisdiction of edd-mughalsarai bp 2026-27.
Work of substation earthing, overhauling of power tf installation of double-circuit underground cables, and construction/strengthening of 11k ht/lt lines within the industrial area(phase-2) under the jurisdiction of edd-mughalsarai bp 2026-27.
Read moreCleaning of sewage line, mh, septic tank, etc incl connected works/items in otm and md accn in the area of age b/r-iii under ge (west) delhi cantt.
Cleaning of sewage line, mh, septic tank, etc incl connected works/items in otm and md accn in the area of age b/r-iii under ge (west) delhi cantt.
Read moreProvn of rain water harvesting near bldg no 1573 and other sanctioned works under the area of age b/r-ii of ge (a) no 1 jodhpur
Provn of rain water harvesting near bldg no 1573 and other sanctioned works under the area of age b/r-ii of ge (a) no 1 jodhpur
Read moreUnder the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.
Under the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.
Read moreA/r and m/o various road under pwd division ser-2/24 during 2026-27 (sh- providing services of sewerman for the monsoon period at pump house located near to rub pul prahaladpur mb road under ser-2/24)
A/r and m/o various road under pwd division ser-2/24 during 2026-27 (sh- providing services of sewerman for the monsoon period at pump house located near to rub pul prahaladpur mb road under ser-2/24)
Read moreA/r and m/o pwd roads under sub division-4 of division c and nd- roads during 2026-27. (sh - making provision for the removal of waterlogging from university area, roshnara road, gt road and rajpur road etc.)
A/r and m/o pwd roads under sub division-4 of division c and nd- roads during 2026-27. (sh - making provision for the removal of waterlogging from university area, roshnara road, gt road and rajpur road etc.)
Read moreConstruction and maintenance of rd road at baghasing sahi to bahadapada under mmsy scheme in the district of gajapati for the year 2026 2027
Construction and maintenance of rd road at baghasing sahi to bahadapada under mmsy scheme in the district of gajapati for the year 2026 2027
Read moreof your Industry type