Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Tender Announcement For Nctps Ii Power Project 💥 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Auxiliary Oil Handling (Aoh) Of Pa Fan For The Nctps Ii 2 X 600 Mw Project Under The M I Circle, Bm Dn Iii, Unit I. 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm The Tender Fee Is Set At Inr 13,700. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of The Same Amount. This Project Is Located At Se Mi Nctps Ii And Is A Significant Opportunity For Suppliers With Expertise In Power Plant Equipment. Bidders Are Expected To Provide Detailed Technical And Financial Proposals To Meet The Project's Stringent Requirements. Keywords: Nctps Ii, Power Project, Auxiliary Oil Handling, Pa Fan, Tneb Limited, State Government Undertaking, Tender, Emd, Bid Submission| Particulars | Details |
|---|---|
| Title |
Nctps Ii 2 X 600 Mw M I Circle Bm Dn Iii Unit I Aoh Of Pa Fan
|
| Description |
Nctps Ii 2 X 600 Mw M I Circle Bm Dn Iii Unit I Aoh Of Pa Fan
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_459631_1 |
|
Reference Number |
SE MI NCTPS II O M 63 24 25 |
| Tender Fee | 0 |
| EMD | 13700 |
| Tender Value | - |
| Place | SE MI NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546351 |
| Start Date | July 03, 2024 22:30 |
| End Date |
Expired
18/07/2024
Expired 818 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm unit iii overhauling of pa fans a b in unit iii for the year 2026 2027
Ttps mech ii bm unit iii overhauling of pa fans a b in unit iii for the year 2026 2027
Read moreNctps i se m ii circle echs dn covering the coal loaded wagon by tarpaulins at nctps 1 and removal the same at destination point at mtps
Nctps i se m ii circle echs dn covering the coal loaded wagon by tarpaulins at nctps 1 and removal the same at destination point at mtps
Read moreTtps operation circle cad aoh complete overhauling of 110 kw auxiliary cooling water pump motors of unit iii at acwph
Ttps operation circle cad aoh complete overhauling of 110 kw auxiliary cooling water pump motors of unit iii at acwph
Read moreWork contract for assistance in work of testing-iii division during aoh of unit no. 5, 1x500 mw, at sgtps, mppgcl, birsinghpur.
Work contract for assistance in work of testing-iii division during aoh of unit no. 5, 1x500 mw, at sgtps, mppgcl, birsinghpur.
Read moreS.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system
S.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system
Read moreProcurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp
Procurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp
Read moreTtps operation circle cad unit iii cw pump 6.6kv, 500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pa
Ttps operation circle cad unit iii cw pump 6.6kv, 500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pa
Read moreNctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Nctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Read moreNctps i se m ii circle ahp dn breakdown routine maintenance of recovery water pump no 1 to 4 for a period of one year from the date of taken over of site
Nctps i se m ii circle ahp dn breakdown routine maintenance of recovery water pump no 1 to 4 for a period of one year from the date of taken over of site
Read moreNctps i se m ii circle ichs dn foph attending of steam oil leaks in valve glands pipe punctures valve flange bonnet in prds system towards foph by on line sealing method for a period of one year
Nctps i se m ii circle ichs dn foph attending of steam oil leaks in valve glands pipe punctures valve flange bonnet in prds system towards foph by on line sealing method for a period of one year
Read moreof your Industry type