Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🚅 Procurement Opportunity: Earthwork Services For Railway Infrastructure 🛤️🌱 The Ministry Of Railways, Central Government, Invites Tenders From Experienced Contractors For The Execution Of Earthwork In Cutting For Lowering Of Cutting Depth, Lining Of Central Wear And Drainage (Cwd), Provision Of Gabions, And Improvement Of Drainage At Midc Cutting Between Km. 344/500 346/400 Under Aen/Kankavali Section In Navi Mumbai. 📅 Bid Submission Deadline: May 17, 2024, 3:00 Pm A Tender Fee Of Inr 78,000 Must Be Submitted With The Bid. Interested Contractors Should Review The Tender Document For Complete Details And Submission Guidelines. Keywords: Earthwork, Railway Infrastructure, Ministry Of Railways, Central Govt. Ministry/Department, Tender, Navi Mumbai, Gabions, Drainage ImprovementParticulars | Details |
---|---|
Title |
Earth Work In Cutting For Lowering Of Cutting Depth, Lining Of Cwd, Providing Of Gabions And Improvement Of Drainage At Midc Cutting Between Km. 344/500 346/400 Under Aen/Kankavali Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74349655 |
Reference Number |
KR-RN-W-2023-87B |
Tender Fee | 0 |
EMD | 78000 |
Tender Value | |
Place | Navi Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74349655/viewNitPdf_4522074.pdf |
Start Date | April 26, 2024 23:00 |
End Date |
17/05/2024 ( Expired 410 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50
Construction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50
Read moreConstruction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Read moreBalance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr
Balance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr
Read moreTender for providing cutting and lopping of tree branches underneath 11 kv ht lines lt line in e section nerchowk under esd ,hpseb,ltd. nerchaowk.
Tender for providing cutting and lopping of tree branches underneath 11 kv ht lines lt line in e section nerchowk under esd ,hpseb,ltd. nerchaowk.
Read moreof your Industry type