Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Speed Brakers/Signage/Zebra Crossing On Various Approch Roads Merging On Sh 25 Under Division Kishangarh Bas
|
Description |
Construction Of Speed Brakers/Signage/Zebra Crossing On Various Approch Roads Merging On Sh 25 Under Division Kishangarh Bas
|
Organisation | PWD - CE AND AS | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 19520 |
Tender Value | |
Place | Alwar / Khairthal / Tijara |
Link |
AAAAAAAAAA Login to view |
Start Date | July 01, 2025 20:30 |
End Date |
17/07/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreConstruction of tar road at ward no.25 amjhar and various roads
Construction of tar road at ward no.25 amjhar and various roads
Read moreConstruction of 2l ps configuration gangapur city bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/866)
Construction of 2l ps configuration gangapur city bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/866)
Read moreConstruction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/865)
Construction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/865)
Read moreWater supply scheme under jjm within ampi block during the year 2025-26/ sh-construction of hydrant post and platform with jjm logo and other works at different locations under ampi dws sub-division. (gr. no.-i).
Water supply scheme under jjm within ampi block during the year 2025-26/ sh-construction of hydrant post and platform with jjm logo and other works at different locations under ampi dws sub-division. (gr. no.-i).
Read moreWater supply scheme under jjm within ampi block during the year 2025-26/ sh-construction of hydrant post and platform with jjm logo and other works at different locations under ampi dws sub-division. (gr. no.-ii).
Water supply scheme under jjm within ampi block during the year 2025-26/ sh-construction of hydrant post and platform with jjm logo and other works at different locations under ampi dws sub-division. (gr. no.-ii).
Read moreSpecial repair of various link roads under special repair program of link roads 2022-23, 2023-24, 2024-25 falling under mc ludhiana l-59.84 km gno.1 including maintenance of road for 5 year (one year defect liability period plus for year maintenance
Special repair of various link roads under special repair program of link roads 2022-23, 2023-24, 2024-25 falling under mc ludhiana l-59.84 km gno.1 including maintenance of road for 5 year (one year defect liability period plus for year maintenance
Read moreConstruction work of various non patchable / missing link roads under package no. rj-32/np/ml/2025-26/02
Construction work of various non patchable / missing link roads under package no. rj-32/np/ml/2025-26/02
Read moreConstruction of left side and right-side approach road of downstream bridge over mendhari nallah tehsil mendhar distt.poonch under sub head 3342 construction of roads below major heads 5054- capital outlay on road and buildings.
Construction of left side and right-side approach road of downstream bridge over mendhari nallah tehsil mendhar distt.poonch under sub head 3342 construction of roads below major heads 5054- capital outlay on road and buildings.
Read moreConstruction work of various non patchable / missing link roads under package no. rj-33/10cr/np/ml/2025-26/02
Construction work of various non patchable / missing link roads under package no. rj-33/10cr/np/ml/2025-26/02
Read moreof your Industry type