Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Diversion/Erection/Dismantling
|
| Description |
Diversion/Erection/Dismantling
Of F 14 For Mine Extension At
Bhaluka In Mines At Sonepur
Bazari Project.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_281276_1 |
|
Reference Number |
GM/SBA/EnM/e-Tender/2023-24/82 |
| Tender Fee | - |
| EMD | 10200 |
| Tender Value | - |
| Place | online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | June 12, 2023 16:30 |
| End Date |
Expired
22/06/2023
Expired 1209 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,
(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn
Read moreDismantling, shifting and erection of 20 nos high mast lighting tower
Dismantling, shifting and erection of 20 nos high mast lighting tower (20/30 mtrs height) in different location as per requirement of mines under kusmunda open cast project
Read moreArc for the dismantling, fabrication , erection of valves, repairing/ strengthening of worn out etc
Arc for the dismantling, fabrication , erection of valves, repairing/ strengthening of worn out etc
Read moreDismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Dismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Read moreDismantling, shifting, re-erection, foundation, electrical cable shifting/extension, earthing, testing and commissioning of street light pole.
Dismantling, shifting, re-erection, foundation, electrical cable shifting/extension, earthing, testing and commissioning of street light pole.
Read moreDismantling, fabrication and erection of ss pipeline work in etp and bio-methanation plant at energy mechanical
Dismantling, fabrication and erection of ss pipeline work in etp and bio-methanation plant at energy mechanical
Read moreErection and dismantling of oh line and other associated jobs such as dismantling and erection of pole, oh conductors, light fittings etc. to illuminate durga puja pandal and colony critical points at balram township under balram ocp, hingula area
Erection and dismantling of oh line and other associated jobs such as dismantling and erection of pole, oh conductors, light fittings etc. to illuminate durga puja pandal and colony critical points at balram township under balram ocp, hingula area
Read moreSupply, dismantling, installation, erection of msrl seal pot with cover as per drg. no. uci/m-026/h
Supply, dismantling, installation, erection of msrl seal pot with cover as per drg. no. uci/m-026/h
Read moreDay-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.
Day-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.
Read moreShifting - re-arrangement of utilities and traffic diversion works
Shifting - re-arrangement of utilities and traffic diversion works for construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station of gurugram metro corridor between mcc to cc
Read moreof your Industry type