Particulars | Details |
---|---|
Title |
Dismentling Of 51dip Belt And Transportation And Installation Of 800 Mm Wide Belt Conveyor Along In 74 Lw From 40d D To 50 D And Extension Of 40 Dw Pony Belt Conveyor From 71 Lw To 81 Lw ( Total 500.00 Mtr.Length)in Seam 0 (Bottom Seam) At Rehar Ug Min
|
Description |
Dismentling Of 51dip Belt And Transportation And Installation Of 800 Mm Wide Belt Conveyor Along In 74 Lw From 40d D To 50 D And Extension Of 40 Dw Pony Belt Conveyor From 71 Lw To 81 Lw ( Total 500.00 Mtr.Length)in Seam 0 (Bottom Seam) At Rehar Ug Min
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_327665_1 |
Reference Number |
GM/BSPR/GMO/Srvy/e-tender/ 2024-25/27 dt.01.02.25 |
Tender Fee | 0 |
EMD | 12700 |
Tender Value | |
Place | REHAR UG MINE OF SECL BISHRAMPUR AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339623 |
Start Date | February 04, 2025 15:30 |
End Date |
17/02/2025 ( Expired 128 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreDi of 600 mm dia sewer by laying 710 mm dia sewer along west side of weh in ke ward
Di of 600 mm dia sewer by laying 710 mm dia sewer line from shree sai prasad restaurant to sahar road junction partly by pipe jacking and partly by hdd method and 315 mm dia by hdd method along west side of weh in ke ward
Read moreExtension of 0l belt from 0l/1d to 0l/0r (200 mtr) in dishergarh seam at satgram project under satgram-sripur area
Extension of 0l belt from 0l/1d to 0l/0r (200 mtr) in dishergarh seam at satgram project under satgram-sripur area
Read moreTransportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Transportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Read moreCo wss for kufru mohal gp bihun in tehsil joginder nagar district mandi h.p sh co rcc intake chamber at kufru nallah and laying, jointing and testing of ppr pipe of 25 mm dia from rd from rd 0 to 500 500 rmt at kufru village dc deposit
Co wss for kufru mohal gp bihun in tehsil joginder nagar district mandi h.p sh co rcc intake chamber at kufru nallah and laying, jointing and testing of ppr pipe of 25 mm dia from rd from rd 0 to 500 500 rmt at kufru village dc deposit
Read moreReplacement of 250mm ac pipes with 250 mm opvc pipe lnpalayam to senjiripirivu in kalangal pumping main from ls 10200 to 23200m and replacement of 140mmpvc with 180mmhdpe 140mm hdpe 3700m senjiri to mandhiripalayam sump ls 0 to 5200m under revamping.
Replacement of 250mm ac pipes with 250 mm opvc pipe lnpalayam to senjiripirivu in kalangal pumping main from ls 10200 to 23200m and replacement of 140mmpvc with 180mmhdpe 140mm hdpe 3700m senjiri to mandhiripalayam sump ls 0 to 5200m under revamping.
Read moreConstruction of 03 nos pcc foundation for installation of pump in ug sump including transportation laying and fitting of pipeline 4inch, 6inch and 8inch from surface to ug sump at bangwar ug mine of sohagpur area
Construction of 03 nos pcc foundation for installation of pump in ug sump including transportation laying and fitting of pipeline 4inch, 6inch and 8inch from surface to ug sump at bangwar ug mine of sohagpur area
Read moreEchp-ii- cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure along with the conveyors from 48a b to 68
Echp-ii- cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure along with the conveyors from 48a b to 68
Read moreTransportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e
Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor 3d tandem for a length of 225 mtr. from 3d 4l to 3d 9l cm panel-trunk road t5 in rv seam and e
Read moreTransportation and installation of 1000mm wide belt conveyor from 71x/5l to 71x/4l, 71x/4l to 78x/4lw and 78x/4lw to 5l/78x in shivpur block at west block of churcha mine (ro).
Transportation and installation of 1000mm wide belt conveyor from 71x/5l to 71x/4l, 71x/4l to 78x/4lw and 78x/4lw to 5l/78x in shivpur block at west block of churcha mine (ro).