Tender Details
Particulars | Details |
---|---|
Title |
Site Preparation Work For Diagnostic Infrastrcuture Up Gradation Under Xv Fc Hg Fy 2022 23 At Amta Ii
|
Description |
Site Preparation Work For Diagnostic Infrastrcuture Up Gradation Under Xv Fc Hg Fy 2022 23
|
Organisation | Government of West Bengal |
Tender Id | 2023_HFW_559758_7 |
Reference Number |
CMOH/DHFWS/How/2004/23 |
Tender Fee | |
EMD | 281 |
Tender Value | |
Place | CMOH Bungalow Howrah |
Link | https://wbtenders.gov.in |
Start Date | August 25, 2023 16:30 |
End Date |
31/08/2023 ( Expired 633 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreSpl repair replacement of lt panels board and coversion of lt overhead line to ug cable and connected work for 1861 unit, provn of geyser against defi in bldg no t 23, t 24a and provn of ups for ot and icu at 162 mh under ge dinjan
Spl repair replacement of lt panels board and coversion of lt overhead line to ug cable and connected work for 1861 unit, provn of geyser against defi in bldg no t 23, t 24a and provn of ups for ot and icu at 162 mh under ge dinjan
Read moreSpl repair for replacement of ber acs at warcen and other sanction work under the area of age b/r-i and b/r-ii of ge (army) no 1 jodhpur
Spl repair for replacement of ber acs at warcen and other sanction work under the area of age b/r-i and b/r-ii of ge (army) no 1 jodhpur
Read moreNit for complete erection work of construction of 01 no. 132kv and 01 no. 33kv feeder bay along with transformer foundation for add. 50mva transformer at bhander 132kv substation under testing division ii gwalior
Nit for complete erection work of construction of 01 no. 132kv and 01 no. 33kv feeder bay along with transformer foundation for add. 50mva transformer at bhander 132kv substation under testing division ii gwalior
Read moreForming tie-up with experienced agencies for pre-bid services and post bid construction work on epc basis through mou for carrying out construction of central admin, dic, hrd and project office complex at sail-isp, burnpur for pkg-ii
Forming tie-up with experienced agencies for pre-bid services and post bid construction work on epc basis through mou for carrying out construction of central admin, dic, hrd and project office complex at sail-isp, burnpur for pkg-ii
Read moreTerm contract for artificers work in zone ii at si lines area under ge bhopal
Term contract for artificers work in zone ii at si lines area under ge bhopal
Read moreTerm contract for artificers work in zone ii at bairagarh area under ge bhopal
Term contract for artificers work in zone ii at bairagarh area under ge bhopal
Read moreConstruction of cover drain from bablu sarkar house to tilak santra house for gray water management at mouza jhicknara, jl no-119, under the fund xv fc(tied)
Construction of cover drain from bablu sarkar house to tilak santra house for gray water management at mouza jhicknara, jl no-119, under the fund xv fc(tied)
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreof your Industry type