Tender Details
Particulars | Details |
---|---|
Title |
C/O Link Road Manjholi Lakhanpur Jhiran Km 0/0 To 8/760 (Sh C/O Sub Structure, Super Structure Of Rcc Box Cell Bridge (7.424x5.00mtr Four Cell Unit) Total Span 32.00 Mtr At Rd 6/240) And M/T Work
|
Description |
C/O Link Road Manjholi Lakhanpur Jhiran Km 0/0 To 8/760 (Sh C/O Sub Structure, Super Structure Of Rcc Box Cell Bridge (7.424x5.00mtr Four Cell Unit) Total Span 32.00 Mtr At Rd 6/240) And M/T Work
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_97406_1 |
Reference Number |
NIT No.9150-54 dated 1-01-2025 |
Tender Fee | 5000 |
EMD | 3.48 Lakh |
Tender Value | |
Place | Nalagarh |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=142958 |
Start Date | January 03, 2025 15:40 |
End Date |
10/01/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
C/o 67.30 mtr span box cell bridge over singaroo khad at rd 1.300 and c/o 22.00 mtr span rcc t beam bridge over tilagan khad at rd 8.610 on salwala sataun road under nabard ridf xxxix.
Prepartion of structural design and drawings and accord its approval there of.
Read moreC o m t from patta awahdevi road to link road village kosad km 0 00 to 1 500
Sh p l cement concrete pavement at rd 0 180 to 0 215 deposit work
Read moreConstruction of 58 20 mtr span steel truss bridge over sundru khad to connect village janglikh at rd 0 980 sh c o steel truss super structure including abutment and bed block with approach on both sides
Construction of 58 20 mtr span steel truss bridge over sundru khad to connect village janglikh at rd 0 980 sh c o steel truss super structure including abutment and bed block with approach on both sides
Read moreConstruction of link road from rail to bassa km 0/0 to 1/600 (sh formation curring 5/7 mtr wide c/o r/wall and 900mm dia hume pipe culvert at rd 0/180 0/255 and 0/345) under otmnp
Construction of link road from rail to bassa km 0/0 to 1/600 (sh formation curring 5/7 mtr wide c/o r/wall and 900mm dia hume pipe culvert at rd 0/180 0/255 and 0/345) under otmnp
Read moreConstruction of link road from gp chouli aganwadi centre to nichali chouli via dhiman basti km. 0/0 to 1/150 (sh c/o 6.00 mtr span rcc slab culvert at rd 1/055) under otmnp
Construction of link road from gp chouli aganwadi centre to nichali chouli via dhiman basti km. 0/0 to 1/150 (sh c/o 6.00 mtr span rcc slab culvert at rd 1/055) under otmnp
Read moreConstruction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy
Balance work for construction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy
Read more/o link road to village jasrath km. 0/00 to 2/000. including 85.00 mtr. span steel truss bridge over chandra bhaga river with approaches at rd. 1/740 (sh rofd at various rds)
/o link road to village jasrath km. 0/00 to 2/000. including 85.00 mtr. span steel truss bridge over chandra bhaga river with approaches at rd. 1/740 (sh rofd at various rds)
Read moreC/o link road to harijan basti kuthar beet km 0/00 to 2/500 (sh c/o of 3.00 m span rcc slab at rd 0/810, c/o r/wall wall at rd. 1/930 to 1/940 lhs, 1/740 to 1/750 rhs, c/o c.c. pavement rd 1/660 to 1/690 ,p/l 60mm thick paver at rd 2/450 to 2/50
C/o link road to harijan basti kuthar beet km 0/00 to 2/500 (sh c/o of 3.00 m span rcc slab at rd 0/810, c/o r/wall wall at rd. 1/930 to 1/940 lhs, 1/740 to 1/750 rhs, c/o c.c. pavement rd 1/660 to 1/690 ,p/l 60mm thick paver at rd 2/450 to 2/50
Read moreC o link road from gosangu gaon pujarli to harli tall pool km 0 00 to 2 500 sh f c 5 7 mtr wide road at rd 1 000 to 2 000
C o link road from gosangu gaon pujarli to harli tall pool km 0 00 to 2 500 sh f c 5 7 mtr wide road at rd 1 000 to 2 000
Read moreC o 24 39 mtr 80 feet span balley bridge over gumma khad to connect gumma vilage at rd 0 480 gp tikkai sh c o sub structure abutment toward gumma side and bed block towards chirgaon side at rd 0 480
C o 24 39 mtr 80 feet span balley bridge over gumma khad to connect gumma vilage at rd 0 480 gp tikkai sh c o sub structure abutment toward gumma side and bed block towards chirgaon side at rd 0 480
Read moreof your Industry type