Tender Details
Particulars | Details |
---|---|
Title |
Ohe Works In Connection With Gx Yard Modification To Enhance Csl Of Line No. 2 &Amp 5 To Accommodate Full Length Trains On These Lines
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78026369 |
Reference Number |
CKP-D-665-GX-YD |
Tender Fee | 0 |
EMD | 78500 |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78026369/viewNitPdf_4747499.pdf |
Start Date | December 16, 2024 18:05 |
End Date |
07/01/2025 ( Expired 153 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreProviding of 70 no out sourced personnel 19 no skilled technical assistant 1 no skilled driver 38 no skilled data entry operator 5 no semi skilled receipt and despatch assistant 6 no un skilled security watch and ward and 1 no un skilled attender for the period of 21 months ie from 01.07.2025 to 31.03.2027 on works contract basis at various places in operation circle west godavari
Providing of 70 no out sourced personnel 19 no skilled technical assistant 1 no skilled driver 38 no skilled data entry operator 5 no semi skilled receipt and despatch assistant 6 no un skilled security watch and ward and 1 no un skilled attender for the period of 21 months ie from 01.07.2025 to 31.03.2027 on works contract basis at various places in operation circle west godavari
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreProviding of 93 no. out sourced personnel i.e.21 no. skilled technical assistants, 6 no. skilled drivers, 40 no. skilled data entry operators, 8 no. semi skilled receipt despatch assistants, 16 no. un-skilled security/ watch ward and 2 no. unskilled attenders for the period of 21 months i.e. from 01.07.2025 to 31.03.2027 on works contract basis at various places in operation circle, eluru
Providing of 93 no. out sourced personnel i.e. 21no. skilled technical assistants, 6 no. skilled drivers, 40 no. skilled data entry operators, 8 no. semi skilled receipt despatch assistants, 16 no. un-skilled security/watch ward and 2 no. unskilled attenders for the period of 21 months i.e. from 01.07.2025 to 31.03.2027 on works contract basis at various places in operation circle, eluru
Read moreProviding lt line and street lights on pcc poles on service road in front of nirankari bhawan and opposite to plot no. 439 in sector-18 (p-i) and other allied works contingent thereto in sector-18 (p-ii) ue jagadhri.. (including three years free mtc.
Providing lt line and street lights on pcc poles on service road in front of nirankari bhawan and opposite to plot no. 439 in sector-18 (p-i) and other allied works contingent thereto in sector-18 (p-ii) ue jagadhri.. (including three years free mtc.
Read moreof your Industry type