Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Proposal For Placement Of Service Order For Capital Overhauling Of Boiler Pressure Parts, Safety Valves And Burner System And Sadc
|
| Description |
Proposal For Placement Of Service Order For Capital Overhauling Of Boiler Pressure Parts, Safety Valves And Burner System And Sadc
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_DPL_541617_1 |
|
Reference Number |
WBDPL/PP/T/GM(PP)- 12013(12)/7/2023/BMD/E/192 |
| Tender Fee | 0 |
| EMD | 2.22 Lakh |
| Tender Value | 0 |
| Place | Office of the GM Power and Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | June 13, 2023 15:30 |
| End Date |
Expired
05/07/2023
Expired 1200 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechiibmunit iiioverhauling of safety valves and high pressure valves of unit iii boiler during the year 20262027
Ttps mechiibmunit iiioverhauling of safety valves and high pressure valves of unit iii boiler during the year 20262027
Read moreTtps mech ii bm unit v overhauling of high pressure valves safety valves in boiler and prds station valves of unit v during overhaul for the year 2026 2027
Ttps mech ii bm unit v overhauling of high pressure valves safety valves in boiler and prds station valves of unit v during overhaul for the year 2026 2027
Read moreBmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit
Bmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit
Read moreTtps es circle instn ii unit v overhauling of 48 nos sadc cylinder positioners and air lock relays 80 nos of instruments pertaining to sadc heavy oil foph block valves prds os 35 and soot blower systems 4 nos burner tilt cylinders 16 nos of instru
Ttps es circle instn ii unit v overhauling of 48 nos sadc cylinder positioners and air lock relays 80 nos of instruments pertaining to sadc heavy oil foph block valves prds os 35 and soot blower systems 4 nos burner tilt cylinders 16 nos of instru
Read moreBmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Read moreAvailing expert service for servicing of various safety valves (make fukui, japan) installed in the boiler of unit no. 3 at 2x660 mw, sstpp, mppgcl, dongalia.
Availing expert service for servicing of various safety valves (make fukui, japan) installed in the boiler of unit no. 3 at 2x660 mw, sstpp, mppgcl, dongalia.
Read moreFacility management services - lumpsum based - industrial o&m of mechanical work, online testing of boiler safety valves consumables to be provided by service provider (inclusive in contract cost)
Facility management services - lumpsum based - industrial o&m of mechanical work, online testing of boiler safety valves consumables to be provided by service provider (inclusive in contract cost)
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreProposal for placement of service order for capital overhauling of boiler pressure parts, safety valves and burner system and sadc
Proposal for placement of service order for capital overhauling of boiler pressure parts, safety valves and burner system and sadc
Read moreOverhauling of boiler non-pressure parts (recuperative air pre-heater, coal burners, wind box, sadc, burner tilt) of unit-3, bktpp
Overhauling of boiler non-pressure parts (recuperative air pre-heater, coal burners, wind box, sadc, burner tilt) of unit-3, bktpp
Read moreof your Industry type