Tender Details
Particulars | Details |
---|---|
Title |
General Ky Ip Acp (Np) 2024 25 Clearingand Desilting Of Maniyur Branch Canal Between Ch 6/000 Km And Ch 10/690km General Civil Work
|
Description |
Ky Ip Acp (Np) 2024 25 Clearingand Desilting Of Maniyur Branch Canal Between Ch 6/000 Km And Ch 10/690km
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_710913_1 |
Reference Number |
IRR/PI/TR/4931/2024_5_7_6/1 |
Tender Fee | 555 |
EMD | 4797 |
Tender Value | |
Place | Mantharathur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1126091 |
Start Date | December 10, 2024 00:25 |
End Date |
16/12/2024 ( Expired 148 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Read moreUrgent repairs at ch. 2.410km and ch. 5.150 km for weaker portion of distributory d1 canal in xeldem village of quepem taluka for the year 2024-25.
Urgent repairs at ch. 2.410km and ch. 5.150 km for weaker portion of distributory d1 canal in xeldem village of quepem taluka for the year 2024-25.
Read moreFor the work of repair of head and cross regulator gate of sadumar branch canal r.d. 0.00 km to 20.910 km. of left bank canal of r.a.b.l.s project
For the work of repair of head and cross regulator gate of sadumar branch canal r.d. 0.00 km to 20.910 km. of left bank canal of r.a.b.l.s project
Read morePeriodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Read moreMaintenance and repair work from km 6/000 to 10/320 and km 16/274 to 19/200 of nh 136 (length 7.246 km) (thanjavur - perambalur - athur road) in the state of tamil nadu under performance based maintenance contract (pbmc) 2024-25
Maintenance and repair work from km 6/000 to 10/320 and km 16/274 to 19/200 of nh 136 (length 7.246 km) (thanjavur-perambalur - athur road) in the state of tamil nadu under performance based maintenance contract (pbmc) 2024-25
Read morePreparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.
Preparation of detailed project report (dpr)for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.
Read moreEmergent repair work in km 0.00 to 1.40 of nh-80 and jacketing work for repair of damaged pier of rcc hl bridge at ch. 53.400 of nh-333 under fdr for the year 2024-25
Emergent repair work in km 0.00 to 1.40 of nh-80 and jacketing work for repair of damaged pier of rcc hl bridge at ch. 53.400 of nh-333 under fdr for the year 2024-25
Read moreFlood damage repairs for the year 2024-25 1.construction of protective wall at km 81/10 of nh-181,2. construction of protective wall at km .88/6 of nh-181 and 3. construction of protective wall at km.92/2 of nh-181 under flood damage repairs (coimba
Flood damage repairs for the year 2024-25 1.construction of protective wall at km 81/10 of nh-181,2. construction of protective wall at km .88/6 of nh-181 and 3. construction of protective wall at km.92/2 of nh-181 under flood damage repairs (coimba
Read moreCarrying out civil works for fixing hr gates of dy s and minors of palghar branch no 2 of surya right bank canal km 0 000 to 24 870.
Carrying out civil works for fixing hr gates of dy s and minors of palghar branch no 2 of surya right bank canal km 0 000 to 24 870.
Read moreGeneral sabarimala festival 2024 25 upgradation with bm and bc 4 900 km raising the waterlogged portions and providing bm and bc to sa college chakkulam road b w ch 0 000 to 4 900 general civil work
General sabarimala festival 2024 25 upgradation with bm and bc 4 900 km raising the waterlogged portions and providing bm and bc to sa college chakkulam road b w ch 0 000 to 4 900 general civil work
Read moreof your Industry type