Tender Details

Particulars Details
Title
Mtps I Bm Unit Iv Boiler Pressure Parts Aoh 2025 Overhauling Of Secondary Air Dampers Scanner Air Fans And Its Damper Flap Gate Reconditioning Of Damaged Wind Box Compartment Dampers Guide Plates Insulation Etc
Description
Mtps I Bm Unit Iv Boiler Pressure Parts Aoh 2025 Overhauling Of Secondary Air Dampers Scanner Air Fans And Its Damper Flap Gate Reconditioning Of Damaged Wind Box Compartment Dampers Guide Plates Insulation Etc
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_589167_1
Reference
Number
CE / MTPS-I / SE / M-I / BM /OT. 215 / 2025-26
Tender Fee 0
EMD 8600
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703832

Start Date August 05, 2025 18:30
End Date
Expired 11/08/2025

Expired 429 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i bm unit ii boiler pressure parts aoh 2026 overhauling of secondary air dampers scanner air fans and its damper flap gate reconditioning of damaged wind box compartment dampers guide plates insulation etc

Mtps i bm unit ii boiler pressure parts aoh 2026 overhauling of secondary air dampers scanner air fans and its damper flap gate reconditioning of damaged wind box compartment dampers guide plates insulation etc

Read more
Mtps i bm unit ii boiler aoh 2026 reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works

Mtps i bm unit ii boiler aoh 2026 reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works

Read more
Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2026 27

Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2026 27

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle

Mtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates

Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate

Mtps i bm unit ii boiler pressure parts aoh 2026 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate

Read more
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii

Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii

Read more
Mtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27

Mtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27

Read more
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Read more
Mtps i bm unit iii boiler pressure parts aoh 2024 overhauling of secondary air dampers scanner air fans and its damper flap gate reconditioning of damaged wind box compartment dampers guide plates insulation etc

Mtps i bm unit iii boiler pressure parts aoh 2024 overhauling of secondary air dampers scanner air fans and its damper flap gate reconditioning of damaged wind box compartment dampers guide plates insulation etc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise