Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Thermoplastic Paint Work Mannu Nagar Darni Road Odr Km 1 2 3 4 5(70)
|
| Description |
Thermoplastic Paint Work Mannu Nagar Darni Road Odr Km 1 2 3 4 5(70)
|
| Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
| Tender Id | 2025_CEBLY_1059870_1 |
|
Reference Number |
1548(4)/Nivida(ET)/2025 Dtd 14-07-2025 |
| Tender Fee | 856 |
| EMD | 73000 |
| Tender Value | - |
| Place | BUDUAUN |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1929932 |
| Start Date | July 25, 2025 14:30 |
| End Date |
Expired
05/08/2025
Expired 432 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Facelifting of vip 1 and allied buildings including emulsion paint, synthetic paint, polishing at wazarat road, jammu. cno-347 np (2nd call)
Facelifting of vip 1 and allied buildings including emulsion paint, synthetic paint, polishing at wazarat road, jammu. cno-347 np (2nd call)
Read moreMrr 2024-25 grant- providing bt renewal on road from pwd road nagarkurnool to pwd road wanaparthy via nallavelly, waddeman, alipur (odr) in bijinepally (m), nagarkurnool assembly constituency of nagarkurnool district, estimate cost rs.600.00lakhs
Mrr 2024-25 grant- providing bt renewal on road from pwd road nagarkurnool to pwd road wanaparthy via nallavelly, waddeman, alipur (odr) in bijinepally (m), nagarkurnool assembly constituency of nagarkurnool district, estimate cost rs.600.00lakhs
Read moreWidening and strengthning of naubasta chamrupur shamserganj ajgara bahuhara bojhwa road (odr) ch-0.000 to 1.700, ch. 4.700 to 6.700 and ch. 14.250 to 23.600 in district pratapgarh fy -2026-27 with five year maintenance (1)
Widening and strengthning of naubasta chamrupur shamserganj ajgara bahuhara bojhwa road (odr) ch-0.000 to 1.700, ch. 4.700 to 6.700 and ch. 14.250 to 23.600 in district pratapgarh fy -2026-27 with five year maintenance (1)
Read moreLaying of cc patches from arr residency to h.no -2-4-70/173 and 174 p in road no:-09 in ward -113 hyderguda div in attapur circle-20,rjnrz, ghmc. (rs. 7.25 lakhs)
Laying of cc patches from arr residency to h.no -2-4-70/173 and 174 p in road no:-09 in ward -113 hyderguda div in attapur circle-20,rjnrz, ghmc. (rs. 7.25 lakhs)
Read moreProviding of temporary lighting (70 nos. of 120w led flood lights) for 1 days (12-10-2026) at talabkatta, nasheman nagar in talab chanchalam division (79) in yakuthpura circle-26 and constituency in view of milad-un-nabi celebrations
Providing of temporary lighting (70 nos. of 120w led flood lights) for 1 days (12-10-2026) at talabkatta, nasheman nagar in talab chanchalam division (79) in yakuthpura circle-26 and constituency in view of milad-un-nabi celebrations
Read moreCarrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Carrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for gaya-rajauli road (sh-70): 6-lane (3-lane on each side) at one location in the state of bihar.
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for gaya-rajauli road (sh-70): 6-lane (3-lane on each side) at one location in the state of bihar.
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreCollection of grit and dust at dept hot mix plant for renewal of mannu nagar darni road odr under general repair of 2025-26
Collection of grit and dust at dept hot mix plant for renewal of mannu nagar darni road odr under general repair of 2025-26
Read moreof your Industry type