Tender Details

Particulars Details
Title
Jungle Clearance And Silt Removal At Ch. 1542 To 1698 Of Bagh Rbc Main Canal System Distt. Balaghat
Description
Jungle Clearance And Silt Removal At Ch. 1542 To 1698 Of Bagh Rbc Main Canal System Distt. Balaghat
Organisation Engineer-in-Chief - Water Resources Department | State Govt. and UT
Tender Id 2025_WRD_419429_1
Reference
Number
2025_WRD_419429
Tender Fee 2295
EMD 10000
Tender Value
Place BAGH RBC
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=501447
Start Date May 30, 2025 16:00
End Date

06/06/2025 ( Expired 24 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra

Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra

Read more
Providing tap connections to consumers, extension and augmentation of water supply system at ferozepur cantt. district ferozepur for distribution network under amrut 2.0 scheme

Providing tap connections to consumers, extension and augmentation of water supply system at ferozepur cantt. district ferozepur for distribution network under amrut 2.0 scheme

Read more
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Read more
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Removal of spillage materials below at various conveyors and feeding to the nearest of tcp 315n2 and bc3b

Removal of spillage materials below at various conveyors and feeding to the nearest of tcp 315n2 and bc3b

Read more
Repair maint of pump motor starter dozing system swimming pool compressor raising main gate valve periodical cleaning of tanks and other misc works

Repair maint of pump motor starter dozing system swimming pool compressor raising main gate valve periodical cleaning of tanks and other misc works at aftc 2 dc area and afs jalahalli east west area

Read more
Ca no. cwe/hills/rkt/38 of 2025-2026 provn of chain link fencing from main office via amn points to sheradeval mandir post approx length 1.5 km and ht 09 ft at mil stn pithoragarh

Ca no. cwe/hills/rkt/38 of 2025-2026 provn of chain link fencing from main office via amn points to sheradeval mandir post approx length 1.5 km and ht 09 ft at mil stn pithoragarh

Read more
Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss

Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss

Read more
Shifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160

Shifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise