Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Addition And Alteration In Ground And Basement Floor Of Computer Secience Department By Providing Pvc Ciiling In Class Room, Brick Work, Irc Fabric Panel In Existing Glazing, Pvc Flooring Including Painting And White Washing In Hp University, Shimla
|
Description |
Addition And Alteration In Ground And Basement Floor Of Computer Secience Department By Providing Pvc Ciiling In Class Room, Brick Work, Irc Fabric Panel In Existing Glazing, Pvc Flooring Including Painting And White Washing In Hp University, Shimla
|
Organisation | Himachal Pradesh University | State Govt. and UT |
Tender Id | 2024_HPU_93162_1 |
Reference Number |
Addition and alteration in ground and basement floor of computer science department by providing PVC |
Tender Fee | 350 |
EMD | 14900 |
Tender Value | |
Place | Summer Hill |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=137382 |
Start Date | September 16, 2024 23:30 |
End Date |
03/10/2024 ( Expired 261 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
A/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )
A/r and m.o to residential builiding under division no-3 at nabha estate shimla&#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&#x0d
Read moreMaintenance of guest room (pitch roof building) of size (40 ft. x20 ft.) with 5 ft. verandah by providing brick wall partition, floor tiles, pvc ceiling, replacement of rusted and damaged gci sheet in/c. attached bathroom cum toilet by construction o
Maintenance of guest room (pitch roof building) of size (40 ft. x20 ft.) with 5 ft. verandah by providing brick wall partition, floor tiles, pvc ceiling, replacement of rusted and damaged gci sheet in/c. attached bathroom cum toilet by construction o
Read moreAr mo to residential builiding under division no 3 at nabha estate shimla (sh providing and fixing cupboard pvc flooring wall floor tiles painting and distempering etc in no. b. 3. 10 at nabha estate shimla
Ar mo to residential builiding under division no 3 at nabha estate shimla (sh providing and fixing cupboard pvc flooring wall floor tiles painting and distempering etc in no. b. 3. 10 at nabha estate shimla
Read moreConstruction of additional accomodation at govt. high school at sard dogri teh. rakkar distt. kangra (hp) (sh c/o six nos. class rooms ( threee room in ground floor and three rooms in first floor with varandah)
Construction of additional accomodation at govt. high school at sard dogri teh. rakkar distt. kangra (hp) (sh c/o six nos. class rooms ( threee room in ground floor and three rooms in first floor with varandah)
Read moreAnnual plan 2023-24 construction of school building for government mlp school thazhekkode stair amp toilet block in ground amp first floor and existing class room building 2nd floor in perinthalmanna lac malappuram dt electrical work
Annual plan 2023-24&#x0d construction of school building for&#x0d government mlp school thazhekkode stair&#x0d amp toilet block in ground amp first&#x0d floor and existing class room building 2nd&#x0d floor in perinthalmanna lac malappuram&#x0d dt electrical work&#x0d
Read moreWater proofing treatment of roof of ccda and toilet area and white washing of class room and teachers room and corridor at the first floor department of social work, university of delhi.
Water proofing treatment of roof of ccda and toilet area and white washing of class room and teachers room and corridor at the first floor department of social work, university of delhi.
Read moreAddition alteration to existing ups enclosure for tech and nanotechnology building at sspl, upgradation and renovation of room no 305 in main building at third floor of training division and water proofing treatment in main building p-09 at dipr unde
Addition alteration to existing ups enclosure for tech and nanotechnology building at sspl, upgradation and renovation of room no 305 in main building at third floor of training division and water proofing treatment in main building p-09 at dipr unde
Read moreReplacing of existing defective fitting with led 12/15 wall recessed downlighter and 18 watts pll led tube for providing proper lighting installed in the basement, ground floor, ist floor, lift, toilet, changing room and store at mph sports complex,
Replacing of existing defective fitting with led 12/15 wall recessed downlighter and 18 watts pll led tube for providing proper lighting installed in the basement, ground floor, ist floor, lift, toilet, changing room and store at mph sports complex,
Read moreModification of existing building of first floor store room and ground floor flooring of digha inspection bungalow at digha under tamluk division, p.w.dte., in the district of purba medinipur during the year 2024-25
Modification of existing building of first floor store room and ground floor flooring of digha inspection bungalow at digha under tamluk division, p.w.dte., in the district of purba medinipur during the year 2024-25
Read moreAddition and alteration in no. 46 and 47 (vice-chancellors residence), by providing transparent polycarboneate sheets roofing over open area outside the accommodation, connecting bridge from road, vitrified tiles inlcuding painting white washi
Addition and alteration in no. 46 and 47 (vice-chancellors residence), by providing transparent polycarbonate sheets roofing over open area outside the accommodation, connecting bridge from road, vitrified tiles including painting and white was
Read moreof your Industry type