Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Storm Water Drainage Work At Ramgarh Shekhawati (Sikar) Under Budge Ghoshna
|
Description |
Storm Water Drainage Work At Ramgarh Shekhawati (Sikar) Under Budge Ghoshna
|
Organisation | Government of Rajasthan |
Tender Id | 2023_RUDSI_362119_1 |
Reference Number |
NIT 11/2023-24 Ramgarh |
Tender Fee | 10000 |
EMD | 10 Lakh |
Tender Value | |
Place | RUDSICO, Jaipur |
Link | https://eproc.rajasthan.gov.in |
Start Date | September 05, 2023 22:30 |
End Date |
14/09/2023 ( Expired 655 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read more81443 provision of water filtration plant alongthwith storage sump at ins parundu under ge tirunelveli
81443 provision of water filtration plant alongthwith storage sump at ins parundu under ge tirunelveli
Read more87717 augmentation of water supply works at ins rajali arakkonam under ge(m) arakkonam
87717 augmentation of water supply works at ins rajali arakkonam under ge(m) arakkonam
Read moreWork of making new tap connections under the water supply
Work of making new tap connections under the water supply
Read moreProviding tap connections to consumers, extension and augmentation of water supply system at ferozepur cantt. district ferozepur for distribution network under amrut 2.0 scheme
Providing tap connections to consumers, extension and augmentation of water supply system at ferozepur cantt. district ferozepur for distribution network under amrut 2.0 scheme
Read moreFor the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,
For the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreProvision of central water heating facility for 10 otm accn at varanasi cantt under ge (east) prayagraj.
Provision of central water heating facility for 10 otm accn at varanasi cantt under ge (east) prayagraj.
Read moreGravelling work with providing concrete base at hazaribagh sub-station and gravelling work with providing concrete base at konar sub-station under gomd-v, dvc, hazaribag
Gravelling work with providing concrete base at hazaribagh sub-station and gravelling work with providing concrete base at konar sub-station under gomd-v, dvc, hazaribag
Read moreof your Industry type