Tender Details

Particulars Details
Title
Khajuha Amauli Road (Odr) Km 19 To Pahadipur (Mominpur) Link Road
Description
Khajuha Amauli Road (Odr) Km 19 To Pahadipur (Mominpur) Link Road
Organisation Government of Uttar Pradesh
Tender Id 2023_CEALD_815743_1
Reference
Number
2920/95C/etendering/P.F.C/2023 Dt 15.06.2023
Tender Fee 2714
EMD 5.75 Lakh
Tender Value -
Place Pratapgarh Circle, PWD, Pratapgarh
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date June 27, 2023 17:00
End Date
Expired 10/07/2023

Expired 1192 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Remaining work of construction of missing link package no. rj-19-01/missing link/2018-19 in distt jhalawar

Remaining work of construction of missing link package no. rj-19-01/missing link/2018-19 in distt jhalawar

Read more
Ward no. 19 khanjapur sith kuldeep mistri se sushil baliyan tak eavam link me rcc nali eavam cc sadak nirman karye.

Ward no. 19 khanjapur sith kuldeep mistri se sushil baliyan tak eavam link me rcc nali eavam cc sadak nirman karye.

Read more
S/r to sailong to brahmanipal via khaliamenta, bhandaridiha, narangapur, keshadurapal road (odr) for 2026-27(depresion filling with bm and sdbc from (r.d.15/150-15/200 km, 16/850-16/900 km, 19/400-19/450 km and 23/800-23/875 km)

S/r to sailong to brahmanipal via khaliamenta, bhandaridiha, narangapur, keshadurapal road (odr) for 2026-27(depresion filling with bm and sdbc from (r.d.15/150-15/200 km, 16/850-16/900 km, 19/400-19/450 km and 23/800-23/875 km)

Read more
S/r to hatadihi samana via jambhira, habaleswar road (odr) such as pot hole and depresion filling with gsb from 19/600 km to 24/000 km) for the year 2026-27.

S/r to hatadihi samana via jambhira, habaleswar road (odr) such as pot hole and depresion filling with gsb from 19/600 km to 24/000 km) for the year 2026-27.

Read more
Special repair to bldg no t 19 and tp 19 or accn and toilet block incl lighting issues and spl repair to boundry wall and chain link fencing around cobra csd canteen under ge p no 1 jabalpur

Special repair to bldg no t 19 and tp 19 or accn and toilet block incl lighting issues and spl repair to boundry wall and chain link fencing around cobra csd canteen under ge p no 1 jabalpur

Read more
Ward no. 19 khanjapur sith omveer foji se sunil kumar advocate ke makan tak eavam link gali me rcc nali eavam cc sadak nirma karye

Ward no. 19 khanjapur sith omveer foji se sunil kumar advocate ke makan tak eavam link gali me rcc nali eavam cc sadak nirma karye

Read more
Ward no. 19 construction of a cc road and underground drain from the ramkola kasaya road via maa kali sthan up to the basaia link road.

Ward no. 19 construction of a cc road and underground drain from the ramkola kasaya road via maa kali sthan up to the basaia link road.

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham

Read more
Ie services for development of link cc between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg1 from km0.000-km7.926 (20.000 km mcw loop ramplink road) in uttar pradesh on ham

Ie services for development of link cc between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg1 from km0.000-km7.926 (20.000 km mcw loop ramplink road) in uttar pradesh on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise