Tender Details
Particulars | Details |
---|---|
Title |
Repairing And Strengthening Of Ep Funnel Assembly And Hard Facing Of Their Splitters During Capital Overhauling Of Unit6 Of 2x250 Mw, Ptpp, Parichha, Jhansi
|
Description |
Repairing And Strengthening Of Ep Funnel Assembly And &Amp#X0d
Hard Facing Of Their Splitters During Capital Overhauling Of &Amp#X0d
Unit6 Of 2x250 Mw, Ptpp, Parichha, Jhansi
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2025_RVUNL_1025377_1 |
Reference Number |
NPAR/C/OMC2/BMD1/6000007951_00 |
Tender Fee | 590 |
EMD | 8000 |
Tender Value | |
Place | BMD-I/OMC-II/CTPS.PTPP PARICHHA JHNASI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1852505 |
Start Date | April 05, 2025 23:30 |
End Date |
28/04/2025 ( Expired 40 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha
Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha
Read moreMaintenance of railway track and other related capital works in rail yard , ptpp , parichha
Maintenance of railway track and other related capital works in rail yard , ptpp , parichha
Read moreRemnant life assessment (rla) study of complete boiler
Remnant life assessment (rla) study of complete &#x0d boiler of unit6 as per ibr during capital &#x0d overhauling of unit6, 2x250mw, ctps, ptpp, &#x0d parichha
Read moreChecking and repairing or replacement of ccp during overhauling of unit 5 btps
Checking and repairing or replacement of ccp during overhauling of unit 5 btps
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreDeployment of radiography team with remote operated gamma radiography shots thickness survey and phase ultrasonic testing during overhauling of unit 9 2x250mw htps kasimpur
Deployment of radiography team with remote operated gamma radiography shots thickness survey and phase ultrasonic testing during overhauling of unit 9 2x250mw htps kasimpur
Read moreRepairing overhauling of brake, clutch assembly and radiator of beml make dozer bd-155 si no. g12955 at 5.0mtpa nlw patherdih coal washery.
Repairing overhauling of brake, clutch assembly and radiator of beml make dozer bd-155 si no. g12955 at 5.0mtpa nlw patherdih coal washery.
Read moreMaintenance and repairing of block no. 2,4 and 7 of secretariat building at kunjaban, agartala during the year 2025-26 under capital complex division (gr-ii).
Maintenance and repairing of block no. 2,4 and 7 of secretariat building at kunjaban, agartala during the year 2025-26 under capital complex division (gr-ii).
Read moreCapital work of power transformer repairing unit kalamassery supplying new lv winding with allied insulation for each phase including coil assembly and clamping hv tap ion over new lv windings corresponding to 12500kva voltamp
Capital work of power transformer repairing unit kalamassery supplying new lv winding with allied insulation for each phase including coil assembly and clamping hv tap ion over new lv windings corresponding to 12500kva voltamp
Read moreSpecial estimate for strengthening of gantry no.51 and 52 foundations / stub repairing of 132kv uklana dablain line under ae tl mtc. gang, hvpnl, tohana during the year 2024-25.
Special estimate for strengthening of gantry no.51 and 52 foundations / stub repairing of 132kv uklana dablain line under ae tl mtc. gang, hvpnl, tohana during the year 2024-25.
Read moreof your Industry type