| Particulars | Details |
|---|---|
| Title |
Shifting Of Iron Elimination Plant From Its Existing Position Behind The Pump House And Construction Of New Foundation And Drain To Place The Same And Distribution Pipeline Laying At The Premises Of Power House Complex, Wbsedcl, Siliguri
|
| Description |
Shifting Of Iron Elimination Plant From Its Existing Position Behind The Pump House And Construction Of New Foundation And Drain To Place The Same And Distribution Pipeline Laying At The Premises Of Power House Complex, Wbsedcl, Siliguri
|
| Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
| Tender Id | 2025_WBSED_840068_1 |
|
Reference Number |
ZM/SLG/e-Tender/2025-26/02 Date 29.04.2025 |
| Tender Fee | 0 |
| EMD | 28031 |
| Tender Value | - |
| Place | Power House Campus, Siliguri |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1873443 |
| Start Date | May 07, 2025 16:30 |
| End Date |
Expired
21/05/2025
Expired 516 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - shifting, placement, erection and commissioning of one no new 250mva gt, make-telk in place of existing one no 250mva gt of unit 1-3, dvc, mtps, mejia and its associated works
Custom bid for services - shifting, placement, erection and commissioning of one no new 250mva gt, make-telk in place of existing one no 250mva gt of unit 1-3, dvc, mtps, mejia and its associated works
Read moreShifting of 3.3 kv overhead lines from its existing position to new position at 4a-patch of bhowra south colliery
Shifting of 3.3 kv overhead lines from its existing position to new position at 4a-patch of bhowra south colliery
Read moreConstruction of foundation and shifting of high mast pole at various place in m.c. nilokheri.(retender)
Construction of foundation and shifting of high mast pole at various place in m.c. nilokheri.
Read moreConstruction of foundation and shifting of high mast pole at various place in m.c. nilokheri.(retender)
Construction of foundation and shifting of high mast pole at various place in m.c. nilokheri.
Read moreDismantling of b-ph unit of ict-2, shifting of spare ict and installation of spare unit in its place and shifting the dismantled ict-2 b phase unit to spare foundation at banala substation
Dismantling of b-ph unit of ict-2, shifting of spare ict and installation of spare unit in its place and shifting the dismantled ict-2 b phase unit to spare foundation at banala substation
Read morePhysical verification of divisional store including shifting of materials dumped in the ody and stocking of same at safer place
Physical verification of divisional store including shifting of materials dumped in the ody and stocking of same at safer place
Read moreShifting of 440v, 4 wire overhead lines from its existing positing to new position at 4a- patch of bhowra south colliery.
Shifting of 440v, 4 wire overhead lines from its existing positing to new position at 4a- patch of bhowra south colliery.
Read moreShifting of 3.3kv overhead lines of 4a patch pumping from its existing position to outside cut area at 4a- patch of bhowra south colliery.
Shifting of 3.3kv overhead lines of 4a patch pumping from its existing position to outside cut area at 4a- patch of bhowra south colliery.
Read moreShifting of pump-motor set, assembling of box pontoon its pipe line shifting di and extension of delivery range as per new position at deco purba coal face of abocp mine
Shifting of pump-motor set, assembling of box pontoon its pipe line shifting di and extension of delivery range as per new position at deco purba coal face of abocp mine
Read moreShifting and installation of 6000 gpm 10uph6 pump 10uph8 2000 gpm its pipe shifting at deco coal face and other place of abocp mine under block-ll area
Shifting and installation of 6000 gpm 10uph6 pump 10uph8 2000 gpm its pipe shifting at deco coal face and other place of abocp mine under block-ll area
Read moreof your Industry type