Tender Details
Particulars | Details |
---|---|
Title |
Bza Division : Bza Vskp Section: Proposed Construction Of New Bridge No. 588 To Avoid Water Stagnation And Discharging Rainy Water.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77861470 |
Reference Number |
E-33-North-BZA-2024 |
Tender Fee | 0 |
EMD | 1.99 Lakh |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77861470/viewNitPdf_4737470.pdf |
Start Date | October 31, 2024 00:27 |
End Date |
21/11/2024 ( Expired 175 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreConstruction of cc drain ward no. 13 from raghuraj school to house of dharmdas shahdol as per nit and estimate.
Construction of cc drain ward no. 13 from raghuraj school to house of dharmdas shahdol as per nit and estimate.
Read moreConstruction of new 4 lane bridge over umardashi river with approachesat km. 153.300 design km. 153.080 of nh 58 near palanpur merwada village in the state of gujarat. job no. 058.gj.2024.25.776 upc_m.00058.25776.gj
Construction of new 4 lane bridge over umardashi river with approachesat km. 153.300 design km. 153.080 of nh 58 near palanpur merwada village in the state of gujarat. job no. 058.gj.2024.25.776 upc_m.00058.25776.gj
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreZone no. 03, ward no. 10, construction of rcc drain, culvert and road from dr. shabhakant dwivedi ji house to shri hari singh ji house.
Zone no. 03, ward no. 10, construction of rcc drain, culvert and road from dr. shabhakant dwivedi ji house to shri hari singh ji house.
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreof your Industry type