Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Drain From S.K. Banerjee Chamber To Tatultala Mohanala At Hargram Under Amarun I G.P Within Bhatar Panchayat Samiti
|
Description |
Construction Of Drain From S.K. Banerjee Chamber To Tatultala Mohanala At Hargram Under Amarun I G.P Within Bhatar Panchayat Samiti
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1750 |
EMD | 7000 |
Tender Value | |
Place | BHATAR PANCHAYAT SAMITI |
Link |
AAAAAAAAAA Login to view |
Start Date | April 29, 2025 16:30 |
End Date |
07/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of rcc drain from main road to rajesh jadia at ward no 27 panna m.p
Construction of rcc drain from main road to rajesh jadia at ward no 27 panna m.p
Read moreConstruction of drain at jhansi khajuraho section package 1 from ch. 0.00 to ch. 76.603 in the state of up mp
Construction of drain at jhansi khajuraho section package 1 from ch. 0.00 to ch. 76.603 in the state of up mp
Read moreConstruction of rcc drain covered at both side of road from guddu samosi wala house to melanga bhujwa house and barua gujrati house to babba beluha house in ward no. 04
Construction of rcc drain covered at both side of road from guddu samosi wala house to melanga bhujwa house and barua gujrati house to babba beluha house in ward no. 04
Read moreConsultancy services for authority engineer for construction of six laning of aurangabad to bihar-jharkhand border (chordaha) section of nh-2 from km. 180.000 to km. 209.827 (pkg-i) in the state of bihar under bharatmala on epc mode
Consultancy services for authority engineer for construction of six laning of aurangabad to bihar-jharkhand border (chordaha) section of nh-2 from km. 180.000 to km. 209.827 (pkg-i) in the state of bihar under bharatmala on epc mode
Read moreConsultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Read moreConstruction of oxygen cylinder store shed and cc road with drain from casualty to ct scan building and rcc drain behind isolation ward at apollo hospital biom bacheli complex
Construction of oxygen cylinder store
 shed and cc road with drain from casualty
 to ct scan building and rcc drain behind
 isolation ward at apollo hospital biom
 bacheli complex
Read moreSupplying and laying of clear water rising main 700 mm dia (m.s) from trikon park at chakdah bongaon road to wtp......under amrut 2.0 programme within bongaon municipality.
Supplying and laying of clear water rising main 700 mm dia (m.s) from trikon park at chakdah bongaon road to wtp.....under amrut 2.0 programme within bongaon municipality.
Read moreUpgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i, 2024-25 package no. an03mb308, (length 3.100 km).
Upgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i, 2024-25 package no. an03mb308, (length 3.100 km).
Read moreZone no. 03, ward no. 15, construction of rcc drain and culvert from shri om prakash shukla house to nh-7 nala near gupta brothers shop at saman.
Zone no. 03, ward no. 15, construction of rcc drain and culvert from shri om prakash shukla house to nh-7 nala near gupta brothers shop at saman.
Read moreof your Industry type