Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pond Lining Rectangular Tank,Pond Lining Second,Surrounding Pcc Concrete,Earth Excavation,Stoning
|
| Description |
|
| Organisation | Horticulture Production Department | undefined |
| Tender Id | GEM/2023/B/4060633 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | October 09, 2023 18:44 |
| End Date |
Expired
19/10/2023
Expired 1091 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
S.B.TRADING CO
570450
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | GREEN INDIA ENTERPRISES | - | 19-10-2023 11:24:15 | MSE | Qualified |
| 2 | S.B.TRADING CO | - | 19-10-2023 11:12:33 | MSE | Qualified |
| 3 | VILLA COMMUNICATION | - | 19-10-2023 11:39:06 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | S.B.TRADING CO( MSE Social Category:General ) | Item Categories : Pond Lining Rectangular Tank,Pond Lining Second,Surrounding PCC concrete,Earth excavation,Stoning | 570450.00 | L1 |
| 2 | GREEN INDIA ENTERPRISES( MSE Social Category:General ) | Item Categories : Pond Lining Rectangular Tank,Pond Lining Second,Surrounding PCC concrete,Earth excavation,Stoning | 666320.00 | L2 |
| 3 | VILLA COMMUNICATION( MSE Social Category:General ) | Item Categories : Pond Lining Rectangular Tank,Pond Lining Second,Surrounding PCC concrete,Earth excavation,Stoning | 714026.00 | L3 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Pond Lining Rectangular Tank | NA | BOQ Item | 336 | ₹ 109200.000 |
| Pond Lining Second | NA | BOQ Item | 252 | ₹ 81900.000 |
| Surrounding PCC concrete | NA | BOQ Item | 9 | ₹ 76500.000 |
| Earth excavation | NA | BOQ Item | 490 | ₹ 286650.000 |
| Stoning | NA | BOQ Item | 9 | ₹ 16200.000 |
Mnklis phase ii package 3 a) enhancement of capacities of thirumaladevuni tank, laxmipur tank and earlapally tank, b) improvements and strengthening of doultabad tank, husnabad tank, kodangal tank and bomraspet tank, c) earthwork excavation, formation of embankment and lining, including construction of cm and cd works for main canals, distributaries, minors and sub minors of utkoor tank, thirumaladevuni tank, jayamma tank, kanukurthy tank, laxmipur tank, earlapally tank, husnabad tank, kodan
Mnklis phase ii package 3 a) enhancement of capacities of thirumaladevuni tank, laxmipur tank and earlapally tank, b) improvements and strengthening of doultabad tank, husnabad tank, kodangal tank and bomraspet tank, c) earthwork excavation, formation of embankment and lining, including construction of cm and cd works for main canals, distributaries, minors and sub minors of utkoor tank, thirumaladevuni tank, jayamma tank, kanukurthy tank, laxmipur tank, earlapally tank, husnabad tank, kodangal tank, bomraspet tank and gravity canal from kanukurthy tank to bomraspet tank, d) construction of lift iv comprising approach channel, pump house and pressure main at kodangal tank under makthal narayanpet kodangal lift irrigation scheme.
Read moreExcavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read morePond lining,pond lining second,surrounding pcc concrete,earth excavation of tank,stoning for surrou
Read more
Earth work excavation,filling of excavated earth,surface dressing,demolishing pcc,demolishing rcc,d
Read more
Earth work excavation in panchayati land pond of village mastpur (ambala).
Earth work excavation in panchayati land pond of village mastpur (ambala).
Read moreEarth work excavation in panchayati land pond of village mastpur (ambala).
Earth work excavation in panchayati land pond of village mastpur (ambala).
Read moreof your Industry type