Particulars | Details |
---|---|
Title |
Providing Heavy Patch Work Links Of Nh.73 (Km.35.00 To 57.00) Under Provl.Sub Divn. Shahzadpur In Ambala Distt. L/R To Panjeton (Fy 2025 26)
|
Description |
Providing Heavy Patch Work Links Of Nh.73 (Km.35.00 To 57.00) Under Provl.Sub Divn.&Amp#X0d
Shahzadpur In Ambala Distt. L/R To Panjeton (Fy 2025 26)
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_448771_1 |
Reference Number |
2025FF94BAC7 C4AF 4009 944C 6A841E18A834617BAR |
Tender Fee | 1680 |
EMD | 10000 |
Tender Value | |
Place | PANJETON |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=526277 |
Start Date | May 24, 2025 14:30 |
End Date |
30/05/2025 ( Expired 24 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreMaintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Maintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Read moreMaintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreAAAAAAAAAA
Login to viewBalance work of rehabilitation and up-gradation of section from km 206.00 to km 239.445 (nimbutala to austin creek) of nh-04 in a n islands on epc basis (pkg-iv) at the risk and cost of existing epc contractor, on percentage rate basis in fy 25-2
Read moreCa no cwe/amb/south-19 of 2025-26 repair/resurfacing of roads including painting and replacement of road furniture in c-2 sector of age b/r-i under ge (south) ambala cantt
Ca no cwe/amb/south-19 of 2025-26 repair/resurfacing of roads including painting and replacement of road furniture in c-2 sector of age b/r-i under ge (south) ambala cantt
Read moreCa no ge(u)/chm-30/2025-26 certain repairs to joinery, flooring, wall tiling, false ceiling, wall panelling work etc in ground floor and first floor of command hospital and other various location under age b/r (ch) of ge(u) chandimandir
Ca no ge(u)/chm-30/2025-26 certain repairs to joinery, flooring, wall tiling, false ceiling, wall panelling work etc in ground floor and first floor of command hospital and other various location under age b/r (ch) of ge(u) chandimandir
Read moreImprovement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km
Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km
Read moreof your Industry type