Tender Details
Particulars | Details |
---|---|
Title |
Boiler Tube Corrosion Mapping By Using Ultrasonic Testing (Ut) Based Automated Robotic Crawler During Annual Oh 3 In The Fy 2023 24
|
Description |
Boiler Tube Corrosion Mapping By Using Ultrasonic Testing Ut Based Automated Robotic Crawler During Annual Oh 3 In The Fy 2023 24
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2024_RVUNL_876453_1 |
Reference Number |
T16/BMDI/OMCII/BTPS/OH3/2023 24 |
Tender Fee | 1180 |
EMD | 35000 |
Tender Value | |
Place | Office of SE OMC-II BTPS PTPP Parichha |
Link | https://etender.up.nic.in |
Start Date | January 02, 2024 00:15 |
End Date |
11/01/2024 ( Expired 516 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nit 98/24-25 annual rate contract for work of transportation of water by tankers in sambhar city urban area under jurisdiction of sub division sambhar division jobner.(arc)
Annual rate contract for work of transportation of water by tankers in sambhar city urban area under jurisdiction of sub division sambhar division jobner.(arc)
Read moreCorrosion mapping of water wall tubes of unit#3 boiler during oh at ntpc vindhayachal.
Corrosion mapping of water wall tubes of unit#3 boiler during oh at ntpc vindhayachal.
Read moreRe tender-deposit annual plan (2023-24) thamarakulam grama panchayat--laying pumping main, supply and erection of pump and commissioning new tube well based water supply scheme at erappanpara pump house ward xii in thamarakulam panchayt
Re tender-deposit annual plan (2023-24) thamarakulam grama panchayat--laying pumping main, supply and erection of pump and commissioning new tube well based water supply scheme at erappanpara pump house ward xii in thamarakulam panchayt
Read moreDeposit work-annual plan(2023-24)thamarakulam gp - construction of temporary pump house,laying pumping main, supply and erection of pump and commissioning new tube well based water supply scheme at vedaraplavu nadeelvayal ward xvi in thamarakulam
Deposit work-annual plan(2023-24)thamarakulam gp - construction of temporary pump house,laying pumping main, supply and erection of pump and commissioning new tube well based water supply scheme at vedaraplavu nadeelvayal ward xvi in thamarakulam
Read moreWater supply scheme under jjm in amarpur rd block under gomati district during the year 2023-24/sh drilling and development of 5(five) nos small bore deep tube well (sbdtw) by manual means in/c installation of pump set, electrical panel board to be
Water supply scheme under jjm in amarpur rd block under gomati district during the year 2023-24/sh drilling and development of 5(five) nos small bore deep tube well (sbdtw) by manual means in/c installation of pump set, electrical panel board to be
Read moreNctps i se mi circle boiler maintenance division annual overhaul works for the year 24 25 specification no 172 24 25
Nctps i se mi circle aoh 24 25 bm dn unit i arresting of air ingression and ash leakages in penthouse of unit i boiler by supply and installation of air sealants during annual overhaul 2024 25
Read morePerformance based maintenance contract -pbmc- work from km 105.00 to km 145.632 of nh - 31c -new nh-17- under nh division - ix, in the district of jalpaiguri, west bengal during the year 2023-24, job no. 017-wb-2023-24-530 - 2nd call.
Performance based maintenance contract -pbmc- work from km 105.00 to km 145.632 of nh - 31c -new nh-17- under nh division - ix, in the district of jalpaiguri, west bengal during the year 2023-24, job no. 017-wb-2023-24-530 - 2nd call.
Read moreGeneral-improvements by providing bm and bc to palayamkunnu kadavinkara policemukku road ch 0/000 to 1/200-budget work 2023-24 in elakamon grama panchayat-general civil
General-improvements by providing bm&#x0d and bc to palayamkunnu kadavinkara&#x0d policemukku road ch 0/000 to 1/200-budget&#x0d work 2023-24 &#x0d policemukku road in elakamon grama&#x0d panchayat-general civil
Read moreNdt testing such as radiography, fibroscopy, thickness measurement, dpt/lpi, paut of joints, oxide scale measurement, stress relieving and corrosion mapping survey etc. of boiler tubes during forthcoming overhauling of 600 mw unit-1, rgtpp, hisar.
Ndt testing such as radiography, fibroscopy, thickness measurement, dpt/lpi, paut of joints, oxide scale measurement, stress relieving and corrosion mapping survey etc. of boiler tubes during forthcoming overhauling of 600 mw unit-1, rgtpp, hpgcl, kh
Read moreRaising of nh-15 from ch 402.400 km (bhajugaon) to ch 403.900 km (jiadhal) (total length 1.500 km) along with providing with 3(three) nos of box culvert in the state of assam under annual plan 2023-24. (epc job no. 15/as/2023/24/249)
Raising of nh-15 from ch 402.400 km (bhajugaon) to ch 403.900 km (jiadhal) (total length 1.500 km)
 along with providing with 3(three) nos of box culvert in the state of assam under annual plan 2023-24. (epc
 job no. 15/as/2023/24/249)
Read moreof your Industry type