Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Open Greasing Of Plummer Block, Fixing Of Guard Plates Of The Ground Bunker, Dismantling And Installation Of Vibrofeeder Along With Alignment, Dismantling And Fixing Of Scrapper In Different Conveyors, Supply Of Nut And Bolts At New Silo, Bocp.
|
| Description |
Open Greasing Of Plummer Block, Fixing Of Guard Plates Of The Ground Bunker, Dismantling And Installation Of Vibrofeeder Along With Alignment, Dismantling And Fixing Of Scrapper In Different Conveyors, Supply Of Nut And Bolts At New Silo, Bocp.
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_MCL_318012_1 |
|
Reference Number |
MCL/BA/EnM/e-Tender/242546 Dated 21.09.2024 |
| Tender Fee | 0 |
| EMD | 6600 |
| Tender Value | - |
| Place | NEW SILO, BHARATPUR OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329627 |
| Start Date | September 25, 2024 15:30 |
| End Date |
Expired
07/10/2024
Expired 699 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and erection of rollers, brackets of all the conveyors of the plant for a period of 365 days at new silo, bocp.
Dismantling and erection of rollers, brackets of all the conveyors of the plant for a period of 365 days at new silo, bocp.
Read moreIchp-routine cleaning and greasing of plummer blocks, resilient couplings in conveyors-49,50,50a,54 etc
Ichp- routine cleaning and greasing of plummer blocks, resilient couplings in conveyors-49,50,50a,54,56,57,57a,58a,58b,59a,59b,60,63,74,bfd-5,6,7a, 7b,10a,10b, trash screen a,b and tripper ab
Read morePreparatory job for carrying out hot joints in steel cord conveyor belts and replacement of steel cord belt in the conveyors for a period of 365 days at new silo, bocp.
Preparatory job for carrying out hot joints in steel cord conveyor belts and replacement of steel cord belt in the conveyors for a period of 365 days at new silo, bocp.
Read moreFabrication- erection of platform, replacement of the planetary gearbox unit, making of shaft of travel drive assembly, replacement of the travel assembly shaft of plough feeder, making of shaft of unbalanced motor of vibrofeeder at new silo, bocp.
Fabrication- erection of platform, replacement of the planetary gearbox unit, making of shaft of travel drive assembly, replacement of the travel assembly shaft of plough feeder, making of shaft of unbalanced motor of vibrofeeder at new silo, bocp.
Read moreDismantling erection of top rollers bottom rollers its brackets in c4 c5 c6 c7 conveyors at rls bocp including its alignment cutting of rope along the conveyor or entangled at any drum of the conveyors for a period of 2 years
Dismantling erection of top rollers bottom rollers its brackets in c4 c5 c6 c7 conveyors at rls bocp including its alignment cutting of rope along the conveyor or entangled at any drum of the conveyors for a period of 2 years
Read morePreparatory job for carrying out hot joints in steel cord conveyor belts and replacement of steel cord belt in the conveyors as and when required for a period of 365days at new silo, bocp.
Preparatory job for carrying out hot joints in steel cord conveyor belts and replacement of steel cord belt in the conveyors as and when required for a period of 365days at new silo, bocp.
Read more1) cleaning of the rls bunker and its periphery area 2) dismantling of the old damaged vibro feeder and re- erection of the new one including the fixing of the spares, shifting, alignment and commissioning in all respect at rls, bocp.
1) cleaning of the rls bunker and its periphery area 2) dismantling of the old damaged vibro feeder and re- erection of the new one including the fixing of the spares, shifting, alignment and commissioning in all respect at rls, bocp.
Read moreDismantling and erection of rollers, brackets of all the conveyors of the plant for 365 days at new silo, bharatpur ocp as per the instruction of engineer in-charge.
Dismantling and erection of rollers, brackets of all the conveyors of the plant for 365 days at new silo, bharatpur ocp as per the instruction of engineer in-charge.
Read moreDismantling shifting and re-erection of 16 metre highmast tower from bbsri silo bunker to langijoda area coal corrider road for mines expansion of lingaraj ocp, lingaraj area
Dismantling shifting and re-erection of 16 metre highmast tower from bbsri silo bunker to langijoda area coal corrider road for mines expansion of lingaraj ocp, lingaraj area
Read moreDismantling shifting and re-erection of 16 metre highmast tower from bbsri silo bunker to langijoda area coal corridor road for mines expansion of lingaraj ocp, lingaraj area
Dismantling shifting and re-erection of 16 metre highmast tower from bbsri silo bunker to langijoda area coal corridor road for mines expansion of lingaraj ocp, lingaraj area
Read moreof your Industry type