Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Contract For Inspection And Rectification / Replacement Of Bearing, Grout And Bed Blocks From Yamuna Bridge (Indraprastha Station) To Dwarka Mor (Excluding) Of Line 3 In Phase I Section (Lot 2)
|
Description |
Maintenance Contract For Inspection And Rectification / Replacement Of Bearing, Grout And Bed Blocks From Yamuna Bridge (Indraprastha Station) To Dwarka Mor (Excluding) Of Line 3 In Phase I Section (Lot 2)
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_DMRC_776112_1 |
Reference Number |
OCM-1474 |
Tender Fee | 23600 |
EMD | 1.71 Lakh |
Tender Value | |
Place | Metro Bhawan |
Link | https://eprocure.gov.in |
Start Date | November 10, 2023 14:30 |
End Date |
17/11/2023 ( Expired 546 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreProviding and laying 600 mm dia d.i. pipe line from ito pump station near indraprastha police station to yamuna bank chhath ghat under sub division-3 of division c and nd- roads, new delhi.
Providing and laying 600 mm dia d.i. pipe line from ito pump station near indraprastha police station to yamuna bank chhath ghat under sub division-3 of division c and nd- roads, new delhi.
Read moreWork contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Work contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Read moreLaying of new 250mm dia swg line in place of 150mm dia swg line from h.no.16-2-740/28/3 to vkd plot no.108/a at kalyan nagar under saidabad section, sd-i of operations and maintenance divn.no.ii.
Laying of new 250mm dia swg line in place of 150mm dia swg line from h.no.16-2-740/28/3 to vkd plot no.108/a at kalyan nagar under saidabad section, sd-i of operations and maintenance divn.no.ii.
Read moreMaintenance of civil work-addition, alteration modification of various buildings and stations from udyog bhawan to saket metro stations including tunnel section from central secretariat to saket ramp in line-2 (for 3 years).
Maintenance of civil work-addition, alteration modification of various buildings and stations from udyog bhawan to saket metro stations including tunnel section from central secretariat to saket ramp in line-2 (for 3 years).
Read moreMaintenance contract for inspection and rectification / replacement of bearing and grout of line-7 from mkpr to svvr in metro network.
Maintenance contract for inspection and rectification / replacement of bearing and grout of line-7 from mkpr to svvr in metro network.
Read moreRate contract for supply, erection, testing , commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i on turnkey basis for fy 2025-26
Rate contract for supply, erection, testing , commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i on turnkey basis for fy 2025-26
Read moreRate contract for supply, erection, testing, commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i for fy 2025-26 labour only
Rate contract for supply, erection, testing, commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i for fy 2025-26 labour only
Read moreComprehensive annual maintenance contract of air brake system of 09 nos. beml - make cmvs of phase-2 and phase-3 of traction wing of different line of dmrc for 05 years.
Comprehensive annual maintenance contract of air brake system of 09 nos. beml - make cmvs of phase-2 and phase-3 of traction wing of different line of dmrc for 05 years.
Read moreLaying of new 250mm swg line in place of 200mm dia sewer line from h.no.16-2-752/61/29 to 16-2-752/a/61/39 at shankeshwar bazar under saidanad section, sd-i of operations and maintenance divn.no.ii.
Laying of new 250mm swg line in place of 200mm dia sewer line from h.no.16-2-752/61/29 to 16-2-752/a/61/39 at shankeshwar bazar under saidanad section, sd-i of operations and maintenance divn.no.ii.
Read moreof your Industry type