Tender Details

Particulars Details
Title
Tn Sc W 58/2024 25/Boiler
Description
Annual Work Contract For Routine Breakdown And Capital Maintenance Of Air Pre Heater Id Fd Pa Fans And Duct And Dampers Of Unit 5 And 6 At 2x660 Mw Csctpp Chhabra
Organisation RRVUN - CMD | State Govt. and UT
Tender Id 2025_RRVUN_442168_1
Reference
Number
TN-SC-W-58/2024-25/Boiler
Tender Fee 4360
EMD 3.14 Lakh
Tender Value
Place CSCTPP,CHHABRA
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=794305
Start Date January 09, 2025 18:30
End Date

30/01/2025 ( Expired 86 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Annual contract for prive and breakdown maintenance of air conditioner installed at pellet plant unit and township of kiocl limited panambur, mangaluru.

Annual contract for prive and breakdown maintenance of air conditioner installed at pellet plant unit and township of kiocl limited panambur, mangaluru.

Read more
Overhauling of id/fd/pa/seal air fans of unit no-9

Major overhauling of id/fd/pa/seal air fans of unit no-9 of 250 mw, dtps htps, kasimpur, aligarh

Read more
Procurement of m/s honsberg make oil flow switch installed in lop system of id, fd and pa, fan in boiler area at 2x660 mw ,sstpp, mppgcl khandwa/etni-ii

Procurement of m/s honsberg make oil flow switch installed in lop system of id, fd and pa, fan in boiler area at 2x660 mw ,sstpp, mppgcl khandwa

Read more
Annual work contract for routine and breakdown mtc. of turbine, heat exchangers, tdbfp turbine and their auxiliaries, mtc. and up-keeping of various pumps in turbine area, opr. and mtc. of 2 nos. eot crane (105/25 mt) in tg hall of katpp, jhalawar

Annual work contract for routine and breakdown mtc. of turbine, heat exchangers, tdbfp turbine and their auxiliaries, mtc. and up-keeping of various pumps in turbine area, opr. and mtc. of 2 nos. eot crane (105/25 mt) in tg hall of katpp, jhalawar

Read more
Annual work contract for work of assistance in operation and maintenance of 0.4 kv oh line/cables for power supply from admin. building to construction sheds for minor maintenance of lighting and power circuit of 5 nos construction office sheds sstpp

Annual work contract for work of assistance in operation and maintenance of 0.4 kv oh line/cables for power supply from admin. building to construction sheds for minor maintenance of lighting and power circuit of 5 nos construction office sheds sstpp

Read more
Annual contract for routine breakdown and capital maintenance works of lt switchgear lt motors and electrical operated motorized valve dampers and soot blowers etc and its associated equipments or works for unit 1 and 2 katpp jhalawar

Annual contract for routine breakdown and capital maintenance works of lt switchgear lt motors and electrical operated motorized valve dampers and soot blowers etc and its associated equipments or works for unit 1 and 2 katpp jhalawar

Read more
Work contract for the preservation of old heating element (basket) of the hot end, intermediate and cold end of rotary air pre heater of unit no. 3,2x660 mw, sstpp, mppgcl,dongalia.

Work contract for the preservation of old heating element (basket) of the hot end, intermediate and cold end of rotary air pre heater of unit no. 3,2x660 mw, sstpp, mppgcl,dongalia.

Read more
Round the clock daily routine prive and breakdown maintenance work of bowl mills and its auxiliaries gc feeder mill reject handling system id fd pa fans mill seal air fan aph and its auxiliaries ecw pump and its associated system of 1x660mw htps

Round the clock daily routine prive and breakdown maintenance work of bowl mills and its auxiliaries gc feeder mill reject handling system id fd pa fans mill seal air fan aph and its auxiliaries ecw pump and its associated system of 1x660mw htps

Read more
Annual maintenance of water supply scheme in sector 6 bahadurgarh

Work of dismantling and relaying of existing water supply line of 100mm and 150mm id including providing and fixing of di specials in sector 6 bahadurgarh and all other works contingent thereto

Read more
Supply of spares for fisher make bfp recirculation valve installed in (2x660 mw),unit 5 and 6, csctpp, rvunl, chhabra

Supply of spares for fisher make bfp recirculation valve installed in (2x660 mw),unit 5 and 6, csctpp, rvunl, chhabra

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise