Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 3x5 Mtr Span Rcc Bridge And Approach Road In Place Of Damaged Arch Culvert Located On The Prakratik Naala At Km 1 Of Nh 28 To Tapesipah Link Road Via Durgapur In District Barabanki.
|
Description |
Construction Of 3x5 Mtr Span Rcc Bridge And Approach Road In Place Of Damaged Arch Culvert Located On The Prakratik Naala At Km 1 Of Nh 28 To Tapesipah Link Road Via Durgapur In District Barabanki.
|
Organisation | Chief Engineer PWD Faizabad Zone | State Govt. and UT |
Tender Id | 2025_CEUFZ_1010137_1 |
Reference Number |
952/3KAM AYOAMBE/E-Tendering /2025 Dt 15-02-2025 |
Tender Fee | 2714 |
EMD | 7 Lakh |
Tender Value | |
Place | BARABANKI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1811998 |
Start Date | February 24, 2025 17:30 |
End Date |
10/03/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreConstruction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Read morePermanent rectification of black spot (id no. cg-(03)-07) at pairi river approach-loharapta bridge gariyaband side from km.59.400 to km.60.100 of nh-130c on sbd mode in the state of chhattisgarh.
Permanent rectification of black spot (id no. cg-(03)-07) at pairi river approach-loharapta bridge gariyaband side from km.59.400 to km.60.100 of nh-130c on sbd mode in the state of chhattisgarh.
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreConstruction of gagan river bridge at km. 152 on delhi-bareilly-lucknow road (old nh-24) in district moradabad
Construction of gagan river bridge at km. 152 on delhi-bareilly-lucknow road (old nh-24) in district moradabad
Read moreof your Industry type