Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtc Of Road From Chakbasta Tsr Camp To Daspara Pwd Road Via Borakha Colony Road During The Year 2025 26 Sh Grouting, Patch Carpetting, Road Side Pucca Drain And Other Allied Works (L 1.20 Km, Ch 0.00 Km To 1.20 Km).
|
| Description |
Mtc Of Road From Chakbasta Tsr Camp To Daspara Pwd Road Via Borakha Colony Road During The Year 2025 26 Sh Grouting, Patch Carpetting, Road Side Pucca Drain And Other Allied Works (L 1.20 Km, Ch 0.00 Km To 1.20 Km).
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_65747_1 |
|
Reference Number |
66/R/DNIeT/EE-JRN/PWD(R and B)/2025-26 |
| Tender Fee | 1000 |
| EMD | 29457 |
| Tender Value | - |
| Place | Jirania |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=66907 |
| Start Date | September 18, 2025 22:30 |
| End Date |
Expired
25/09/2025
Expired 363 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtc of road from chakbasta tsr camp to daspara via borakha colony road during the year 2024-25 sh grouting, metalling, re-carpetting, seal coat etc.(l 1.20 km, from ch.0.00 mtr to ch.1200.00mtr)
Mtc of road from chakbasta tsr camp to daspara via borakha colony road during the year 2024-25 sh grouting, metalling, re-carpetting, seal coat etc.(l 1.20 km, from ch.0.00 mtr to ch.1200.00mtr)
Read moreP.r of road from devendra sardar para junction to duski tsr camp (l-1.20 km)
Patch metalling, grouting, re-carpetting etc. under kalyanpur rd block during the year 2023-24.
Read moreAnnual maintenance of road connecting from nh-48 to aregujjanahalli via mydala ch 0.00 to 1.20 km in tumkur taluk (0.00 to 1.20 km) for the year 2026-27
Annual maintenance of road connecting from nh-48 to aregujjanahalli via mydala ch 0.00 to 1.20 km in tumkur taluk (0.00 to 1.20 km) for the year 2026-27
Read moreMmppna_ridf_xxxi_25_26_306 construction of (1) kacharichuk ali from ch. 0.00 m to ch. 1200.00 m (l-1.20 km) (2) bhulaguri borchapori road from ch. 0.00 m to ch. 1200.00 m (l-1.20 km) (3) koiri bosti ali from ch. 0.00 m to ch. 1200.00 m (l-1.20 km)
Mmppna_ridf_xxxi_25_26_306 construction of (1) kacharichuk ali from ch. 0.00 m to ch. 1200.00 m (l-1.20 km) (2) bhulaguri borchapori road from ch. 0.00 m to ch. 1200.00 m (l-1.20 km) (3) koiri bosti ali from ch. 0.00 m to ch. 1200.00 m (l-1.20 km)
Read moreMtc. of all internal roads of state poultry farm at gandhigram during the year 2023-24. (l-1.20 km) /sh grouting, carpeting and seal coat from ch 0.00 to ch 1.20
Mtc. of all internal roads of state poultry farm at gandhigram during the year 2023-24. (l-1.20 km) /sh grouting, carpeting and seal coat from ch 0.00 to ch 1.20
Read moreMtc of road from shuhanmani ashram to nalgaria via bartan during the year 2025-26 sh grouting, patch carpetting, road side pucca drain and other allied works (l 1.5 km, ch 0.00 km to 1.5 km).
Mtc of road from shuhanmani ashram to nalgaria via bartan during the year 2025-26 sh grouting, patch carpetting, road side pucca drain and other allied works (l 1.5 km, ch 0.00 km to 1.5 km).
Read moreDevelopment of road from ludhamura to barmura (l - 1.20 km) ch. 0.00 km to 1.20 km under kathalia rd block within the jurisdiction of kathalia pwd(randb) sub division
Sh patch metalling patch grouting carpeting with sand seal coat and other allied works
Read moreMtc of road from gopal chowmuhani pwd road to harijoy chowdhury para via bhramatilla during the year 2025-26 sh grouting, patch carpetting, road side pucca drain, palasiding and other allied works (l 1.39 km, ch 0.00 km to 1.39 km).
Mtc of road from gopal chowmuhani pwd road to harijoy chowdhury para via bhramatilla during the year 2025-26 sh grouting, patch carpetting, road side pucca drain, palasiding and other allied works (l 1.39 km, ch 0.00 km to 1.39 km).
Read moreRunning mtc of road from ludhamura to barmura (l - 1.20 km) ch. 0.00 km to 1.20 km under kathalia rd block within the jurisdiction of kathalia pwd(randb) sub division
Sh patch metalling patch grouting carpeting with sand seal coat and other allied works
Read moreMtc of road from ranirbazar nit road to thandakali bari during the year 2024-25 sh grouting, metalling, re-carpetting, seal coat etc. (l 1.14 km, from ch.0.00 mtr to ch.1140.00 mtr)
Mtc of road from ranirbazar nit road to thandakali bari during the year 2024-25 sh grouting, metalling, re-carpetting, seal coat etc. (l 1.14 km, from ch.0.00 mtr to ch.1140.00 mtr)
Read moreof your Industry type