Tender Details

Particulars Details
Title
Set Of Modified Sander Pipe For Wag 9 Loco (Rh & Lh) Along With Accessories As Per Drg.No.Els /Vskp/ 2016/24.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106809523
Reference
Number
EA251255
Tender Fee 0
EMD 0
Tender Value -
Place Kolkata
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/092025/106809523/viewNitPdf_5093836.pdf

Start Date August 27, 2025 21:24
End Date
Expired 19/09/2025

Expired 395 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Set of modified sander pipe (rh & lh) for wag- 9 loco as per vskp s drg. no. els/vskp/2016/24

Set of modified sander pipe (rh & lh) for wag- 9 loco as per vskp s drg. no. els/vskp/2016/24

Read more
Set of mpdified sander pipe (rh & lh) for wag- 9 loco as per vskp s drg. no. els/vskp/2016/24

Set of mpdified sander pipe (rh & lh) for wag- 9 loco as per vskp s drg. no. els/vskp/2016/24

Read more
Set of mpdified sander pipe (rh & lh) for wag- 9 loco as per vskp s drg. no. els/vskp/2016/24

Set of mpdified sander pipe (rh & lh) for wag- 9 loco as per vskp s drg. no. els/vskp/2016/24

Read more
Set of modified sander pipe (rh & lh) for wag- 9 loco

Set of modified sander pipe (rh & lh) for wag- 9 loco

Read more
Modified foot step assembly (rh & lh)

Modified foot step assembly (rh & lh)

Read more
Modified foot step assembly rh and lh

Modified foot step assembly rh and lh

Read more
Set of 1 inch end cock for three phase loco. each set consists of (1) 1 inch end cock [rh] as per ftrtipl part no.-007003000 or kbi part no.- i41081 for dbp, qty.-01 no. (2) 1 inch end cock [lh] as per ftrtipl part no.-007003100 or kbi part no.- i35875 for mrep, qty.-01 no.

Set of 1 inch end cock for three phase loco. each set consists of (1) 1 inch end cock [rh] as per ftrtipl part no.-007003000 or kbi part no.- i41081 for dbp, qty.-01 no. (2) 1 inch end cock [lh] as per ftrtipl part no.-007003100 or kbi part no.- i35875 for mrep, qty.-01 no.

Read more
Provision of top operated handle for cbc comprising of following items per loco (13 items in 84 nos.) as follows:- (1) operating rod rh, els/erode drg. no.- sr. dee/rs/ed/mech:103 (alt.-1 or latest), qty.- 02. (2) operating rod lh, drg. no.-sr. dee/rs/ed/mech:103 (alt.-1 or latest), qty.= 02. (3) operating rod middle, drg. no.- sr. dee/rs/ed/mech:103 (alt.-1 or latest),qty.- 02. (4) link, drg. no.- sr. dee/rs/ed/mech:103 (alt.-1or latest), qty.- 02. (5) top lifting assembly with pin, drg. no.-

Provision of top operated handle for cbc comprising of following items per loco (13 items in 84 nos.) as follows:- (1) operating rod rh, els/erode drg. no.- sr. dee/rs/ed/mech:103 (alt.-1 or latest), qty.- 02. (2) operating rod lh, drg. no.-sr. dee/rs/ed/mech:103 (alt.-1 or latest), qty.= 02. (3) operating rod middle, drg. no.- sr. dee/rs/ed/mech:103 (alt.-1 or latest),qty.- 02. (4) link, drg. no.- sr. dee/rs/ed/mech:103 (alt.-1or latest), qty.- 02. (5) top lifting assembly with pin, drg. no.-

Read more
Self er repair and fitment,fly wheel sensor,relay 12v,fog light assy,hood light assy,hood light wiring with sleeving,ram assy new,hood air pressur pipe,clutch release bearing,gear box repair with accessories and assembling,mud guard mats,fixing of new fan belt water pump bolts 8nos,fly wheel sensor,electrical labour charges,mechanical labour charges for removal and reassembling,clutch plate,clutch pressure plate,clutch sleeve cylinder assy,clutch booster,clutch release bearing,fly wheel bearing,fly wheel lock,uj cross spider bearing,hub packing seal nut and bolt,mechanical labour charges for removal and reassembling,hood lifting pump assy,loom wiring with sleeving,hood light assy,reverse light switch,reverse horn buzzer,mud guard mats,electrical labour charges,mechanical labour charges for removal and re-assembling,hood lifting pump assy,hood air pressur pipe,tail light assy rh lh,reverse horn buzzer,fuse 10 ampier,reverse switch wiring,hub packing seal nuts and bolt,fog light assy,indicator assy rh lh,s

Self er repair and fitment,fly wheel sensor,relay 12v,fog light assy,hood light assy,hood light wiring with sleeving,ram assy new,hood air pressur pipe,clutch release bearing,gear box repair with accessories and assembling,mud guard mats,fixing of new fan belt water pump bolts 8nos,fly wheel sensor,electrical labour charges,mechanical labour charges for removal and reassembling,clutch plate,clutch pressure plate,clutch sleeve cylinder assy,clutch booster,clutch release bearing,fly wheel bearing,fly wheel lock,uj cross spider bearing,hub packing seal nut and bolt,mechanical labour charges for removal and reassembling,hood lifting pump assy,loom wiring with sleeving,hood light assy,reverse light switch,reverse horn buzzer,mud guard mats,electrical labour charges,mechanical labour charges for removal and re-assembling,hood lifting pump assy,hood air pressur pipe,tail light assy rh lh,reverse horn buzzer,fuse 10 ampier,reverse switch wiring,hub packing seal nuts and bolt,fog light assy,indicator assy rh lh,s

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise