Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Ttps Es Instn I Overhaul & Testing Services Required 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Overhaul, Painting, Repair, And Functional Testing Of 4 Burner Tilt Power Cylinders, As Well As The Overhaul, Calibration, Refixing, And Load Testing Of 44 Sadc Power Cylinders. 🔧 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm Tender Fee: Inr 1000 Interested Bidders Must Demonstrate Expertise In Handling Such Equipment And Provide A Detailed Proposal, Including Methodology, Timelines, And Cost Estimates. Keywords: Tneb Limited, Ttps Es Instn I, Power Cylinders, Overhauling, Testing, State Government, Ut Undertaking, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Ttps Es Instn I Releasing Transporting Overhauling Painting Re Fixing And Conducting Functional Test On 4 Nos Burner Tilt Power Cylinders And Releasing Overhauling Calibrating Refixing And Conducting Load Test On 44 Nos Sadc Power Cylinders In Un
|
| Description |
Ttps Es Instn I Releasing Transporting Overhauling Painting Re Fixing And Conducting Functional Test On 4 Nos Burner Tilt Power Cylinders And Releasing Overhauling Calibrating Refixing And Conducting Load Test On 44 Nos Sadc Power Cylinders In Un
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_459585_1 |
|
Reference Number |
CE/SE/ES /TTPS /No.171/2024-25 |
| Tender Fee | 0 |
| EMD | 1000 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546288 |
| Start Date | July 03, 2024 19:30 |
| End Date |
Expired
18/07/2024
Expired 779 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps es instn i releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cylinders in un
Ttps es instn i releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cylinders in un
Read moreTtps es instn i estimate for releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cy
Ttps es instn i estimate for releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cy
Read moreTtps es circle instn i charges towards releasing, transporting overhauling checking, painting re fixing and conducting of functional test on 4 nos burner tilt power cylinders and overhauling calibrating and conducting functional test of
Ttps es circle instn i charges towards releasing, transporting overhauling checking, painting re fixing and conducting of functional test on 4 nos burner tilt power cylinders and overhauling calibrating and conducting functional test of
Read moreTtps es circle instn ii overhauling of 48 nos sadc cylinders with positioners air lock relays 80 nos of instruments pertaining to sadc heavy oil prds os 35 and soot blower systems 4 nos burner tilt cylinders 16 nos of instruments pertaining to sad
Ttps es circle instn ii overhauling of 48 nos sadc cylinders with positioners air lock relays 80 nos of instruments pertaining to sadc heavy oil prds os 35 and soot blower systems 4 nos burner tilt cylinders 16 nos of instruments pertaining to sad
Read moreTtps es circle instn ii overhauling of 48 nos sadc cylinder positioners and air lock relays 78 nos of instruments pertaining to sadc heavy oil prds and soot blower systems 4 nos burner tilt cylinders 14 nos of instruments pertaining to burner tilt
Ttps es circle instn ii overhauling of 48 nos sadc cylinder positioners and air lock relays 78 nos of instruments pertaining to sadc heavy oil prds and soot blower systems 4 nos burner tilt cylinders 14 nos of instruments pertaining to burner tilt
Read moreOverhauling cleaning conducting the hydraulic test
Overhauling cleaning conducting the hydraulic test
Read moreConducting ndt test for 200 nos
Conducting ndt test for 2000 nos of 56.25 / 67.5 cft coal tubs critical components i.e tub couplings (hooks) at ug mines of srp area, for a period of 180 days as per the scope of work and terms and conditions of nit.
Read moreRepair and overhauling service - hydrostatic pressure test of scaba cylinders; hydrostatic pressure
Read more
Repair and overhauling service - hydrostatic pressure test of scaba cylinders; hydrostatic pressure
Read more
Complete overhauling of 02 nos stsy cylinders applicable to bd355 dozers
Complete overhauling of 02 nos stsy cylinders applicable to bd355 dozers
Read moreof your Industry type