Particulars | Details |
---|---|
Title |
Mtps Tm Unit Ii Cleaning And Painting Of And Outer Portion Of Receiver Tanks Of 1 2 For Instrument Air And Renewal Of Manhole Door Gaskets And Overhauling Of Safety Valves Of Receiver Tanks Overhauling Of Silica Gel Type Air Drier Accessor
|
Description |
Mtps Tm Unit Ii Cleaning And Painting Of And Outer Portion Of Receiver Tanks Of 1 2 For Instrument Air And Renewal Of Manhole Door Gaskets And Overhauling Of Safety Valves Of Receiver Tanks Overhauling Of Silica Gel Type Air Drier Accessor
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_488395_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 178 / 2024-25 |
Tender Fee | 0 |
EMD | 2000 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=580456 |
Start Date | September 26, 2024 18:30 |
End Date |
10/10/2024 ( Expired 226 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm unit iv complete overhauling and painting of instrument air compressors iac 4a 4b 4c
Mtps i tm unit iv complete overhauling and painting of instrument air compressors iac 4a 4b 4c
Read moreMtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type airdrie
Mtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type air drie
Read moreMtps i tm unit i overhauling of olctc system pump lhs rhs inspection cleaning of condenser cw box steam side hot well olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser
Mtps i tm unit i overhauling of olctc system pump lhs rhs inspection cleaning of condenser cw box steam side hot well olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreMtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets
Mtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreMtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc
Mtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc
Read moreMtps i m ii oahs fam pdfacs unit iii attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reasse
Mtps i m ii oahs fam pdfacs unit iii attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reasse