Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
P.No. 244 /2023 24 Construction Of Retaining Wall At The Back Side Of Buds School Site In Chembilode Gp
|
| Description |
R.C.C.Retaining Wall
|
| Organisation | Government of Kerala |
| Tender Id | 2023_LSGD_602136_1 |
|
Reference Number |
1/2023/AE/LSGD/CHD 3 |
| Tender Fee | 2760 |
| EMD | 31659 |
| Tender Value | - |
| Place | CHEMBILODE G.P. |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | September 13, 2023 14:30 |
| End Date |
Expired
20/09/2023
Expired 1119 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Co retaining wall back side of chdh at bop sonaichera of 97 bn bsf under shq bsf panisagar
Co retaining wall back side of chdh at bop sonaichera of 97 bn bsf under shq bsf panisagar
Read moreProvn of retaining wall behind bldg no t-244 t-243 t-242 t-241 and adjacent bldg no t-288 t-249 t-250 t--251 xxxxx under age (i) zakhama
Provn of retaining wall behind bldg no t-244 t-243 t-242 t-241 and adjacent bldg no t-288 t-249 t-250 t--251 xxxxx under age (i) zakhama
Read more37. gram panchayat bhaisaundha majra dhatarun purwa construction of 2 rapta causeways with retaining walls plus cc road, at the erosion site.
37. gram panchayat bhaisaundha majra dhatarun purwa construction of 2 rapta causeways with retaining walls plus cc road, at the erosion site.
Read moreSupplying and erection of precast earth retaining walls and backfilling of earth for engineering halls canteen at sea side, north site, barc, trombay, mumbai
Supplying and erection of precast earth retaining walls and backfilling of earth for engineering halls canteen at sea side, north site, barc, trombay, mumbai
Read moreRepair to retaining wall temporary and covered shed and other connecting works at inhs patanjali, nchc, mes area and site e of naval base area karwar
Repair to retaining wall temporary and covered shed and other connecting works at inhs patanjali, nchc, mes area and site e of naval base area karwar
Read moreConstruction of a retaining wall, drainage and sewerage systems, and site development work on the residential side near the corridor of the shri lete hue hanuman ji temple.
Construction of a retaining wall, drainage and sewerage systems, and site development work on the residential side near the corridor of the shri lete hue hanuman ji temple.
Read morePf il tiles rg from opp site street house of bhola miti wala to house of sarpanch and house of raju street and house of vicky to sahed baba samadh back side onkar petrol pump gobindhgarh road wno 2 mc amloh
Pf il tiles rg from opp site street house of bhola miti wala to house of sarpanch and house of raju street and house of vicky to sahed baba samadh back side onkar petrol pump gobindhgarh road wno 2 mc amloh
Read moreSupply of relay, ac immune, plug-in-type, style qbat, aci, dc biased track relay 9 ohms, 2f-2b contacts, front and back contacts metal to carbon, complete with plug board, retaining clip and connectors conforming as per rdso/spn/84 ver 2.0 or latest if any interlocking code is abejx.
Supply of relay, ac immune, plug-in-type, style qbat, aci, dc biased track relay 9 ohms, 2f-2b contacts, front and back contacts metal to carbon, complete with plug board, retaining clip and connectors conforming as per rdso/spn/84 ver 2.0 or latest if any interlocking code is abejx.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type