Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Special Repair Of Link Road Village Dhanana To Village Mandana In Bawani Khera Consty. Distt. Bhiwani (Road Id 436) Road Length 6 Km
|
| Description |
Earth Work, Wbm, Bitumen Concrete , Road Safety Etc.
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_439728_1 |
|
Reference Number |
20259032EAD8 D2D7 4218 ABBC 3B13122393912164DEV |
| Tender Fee | 6180 |
| EMD | 1.59 Lakh |
| Tender Value | |
| Place | DHANANA MANDHANA |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=517084 |
| Start Date | April 09, 2025 22:30 |
| End Date |
Expired
24/04/2025
Expired 418 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreEarth work in in filling rain cuts, side cuts, pots holes,ruts ,jungle cutting and repair of brick soling between km 12.900 to km 13.500 of vikramjot dhushwa bund on left bank of ghaghra river in distt. basti.
Earth work in in filling rain cuts, side cuts, pots holes,ruts ,jungle cutting and repair of brick soling between km 12.900 to km 13.500 of vikramjot dhushwa bund on left bank of ghaghra river in distt. basti.
Read moreConstruction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Construction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Read moreImprovement development of drainage system and road jafrabad village in ward chauhan bangar (1) gali no 10 from dr. alam clinic to rehman paan wala and its links (2) link-1 ustani wali gali from new look saloon to b-643 (3) link-2 from h.no -810 to h
Improvement development of drainage system and road jafrabad village in ward chauhan bangar (1) gali no 10 from dr. alam clinic to rehman paan wala and its links (2) link-1 ustani wali gali from new look saloon to b-643 (3) link-2 from h.no -810 to h
Read moreImprovement development of drainage system and road jafrabad village in ward chauhan bangar (1) gali no. 20 from h.no- 411 to h.no- 425 and its links link-1 from h.no-418 to al- quraish collection, link-2 masjid to h.no-450 (2) gali no 18 from h.no-3
Improvement development of drainage system and road jafrabad village in ward chauhan bangar (1) gali no. 20 from h.no- 411 to h.no- 425 and its links link-1 from h.no-418 to al- quraish collection, link-2 masjid to h.no-450 (2) gali no 18 from h.no-3
Read moreImprovement development of drainage system and road jafrabad village in ward chauhan bangar (1) gali no-33 from a.k company to h.no-1027 (2) gali no-34 from h.no-1048 to bharat jewellers (3) gali no-39/7 from h.no-1249 to h.no- 1258 (4) gali no-39/6
Improvement development of drainage system and road jafrabad village in ward chauhan bangar (1) gali no-33 from a.k company to h.no-1027 (2) gali no-34 from h.no-1048 to bharat jewellers (3) gali no-39/7 from h.no-1249 to h.no- 1258 (4) gali no-39/6
Read moreImprovement development of drainage system and road jafrabad village in ward chauhan bangar (1) gali no 13 from h.no- 240/6 to shop no- 223 (2) gali no 19 from shop no- 410 to shop no- 455 shri ganesh traders (3) gali no 22 from shop no- 507 to ezan
Improvement development of drainage system and road jafrabad village in ward chauhan bangar (1) gali no 13 from h.no- 240/6 to shop no- 223 (2) gali no 19 from shop no- 410 to shop no- 455 shri ganesh traders (3) gali no 22 from shop no- 507 to ezan
Read moreSpecial repair of link road from village bandaheri (mundhal) to kungar
Special repair of link road from village bandaheri (mundhal) to kungar in bawani khera consty., distt. bhiwani (id-421)
Read moreof your Industry type