Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Ahp Stage I Ii Awph Overhauling And Load Testing Of 7 5 Ton Capacity Eot Cranes In Ash Water Pump House
|
Description |
Ttps Mech Ii Ahp Stage I Ii Awph Overhauling And Load Testing Of 7 5 Ton Capacity Eot Cranes In Ash Water Pump House
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_535316_1 |
Reference Number |
CE/TTPS/SE/M-II/No.426/2024-25 |
Tender Fee | 0 |
EMD | 1400 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=637168 |
Start Date | March 25, 2025 19:30 |
End Date |
09/04/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of storm water drain and culvert in olisha nagar street 8 (18600r0166), sathath nagar street 7 (186004r0064) ,sathath nagar street 5 west cross 3 (186004r0056) at pallapatti municipality .
Construction of storm water drain and culvert in olisha nagar street 8 (18600r0166), sathath nagar street 7 (186004r0064) ,sathath nagar street 5 west cross 3 (186004r0056) at pallapatti municipality .
Read moreSupply, fabrication, installation, testing and commissioning the flexible connections for hvac ducts in auditorium-i and ii, committee hall lh-i, ii and iii of convention centre, jnu-jnu/engg./02/2025-26
Supply, fabrication, installation, testing and commissioning the flexible connections for hvac ducts in auditorium-i and ii, committee hall lh-i, ii and iii of convention centre, jnu, new delhi
Read moreAssistance in breakdown prive maintenance and annual overhauling of fsss and sadc systems for ggsstp stage-ii and iii units.
Assistance in breakdown prive maintenance and annual overhauling of fsss and sadc systems for ggsstp stage-ii and iii units.
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreProcurement of pump with motor and other accessories for ash water recovery system under ahp-mm dept., ktps through capex 25-26.
Procurement of pump with motor and other accessories for ash water recovery system under ahp-mm dept., ktps through capex 25-26.
Read moreDesign, engineering, supply, erection, testing and erection and commissioning works and complete revamping of fire affected units i and ii of ttps
Design, engineering, supply, erection, testing and erection and commissioning works and complete revamping of fire affected units i and ii of ttps
Read moreProtective maintenance works in chambers 4c and 4d of forebay in cooling water pump house 2
Protective&#x0d maintenance works in chambers 4c and 4d of forebay in&#x0d cooling water pump house 2
Read moreLoad testing and certification of 04 nos eot cranes of btps by actual load of water bags or balloons as per statutory requirements
Load testing and certification of 04 nos eot cranes of btps by actual load of water bags or balloons as per statutory requirements
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreMaking of rcc sump pit for accumulation of overflow ash water along with raising of floor of ash slurry ph and drainage system revival at stage-i, ktps
Making of rcc sump pit for accumulation of overflow ash water&#x0d along with raising of floor of ash slurry ph and drainage system&#x0d revival at stage-i, ktps
Read moreof your Industry type