Tender Details

Particulars Details
Title
Erosion Protection Shield And Clamp Suitable For Back Pass Super Heater Front Tubes, Low Temperature Super Heater Ltsh Coil Tubes For 600 Mw Boiler Of Unit I
Description
Erosion Protection Shield And Clamp Suitable For Back Pass Super Heater Front Tubes, Low Temperature Super Heater Ltsh Coil Tubes For 600 Mw Boiler Of Unit I&Amp#X0d
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_533745_1
Reference
Number
CE-258/2024-25/NCTPS-II
Tender Fee 0
EMD 8200
Tender Value -
Place NCTPS II
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=635329

Start Date March 19, 2025 22:30
End Date
Expired 02/04/2025

Expired 561 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler

Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler

Read more
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler

Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler

Read more
Ot 14 removing and refixing the cassette baffle from low temperature super heater ltsh

Removing and refixing the cassette baffle from low temperature super heater ltsh upper bank coils and low temperature reheater ltrh lower bank coils shrouding plates from various places of boiler tubes such that hra fsh and frh

Read more
Boiler#5 start up and super heater safety valve work

Boiler#5 start up and super heater safety valve work

Read more
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027

Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027

Read more
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2

Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2

Read more
Procurement of various erosion protection sleeves (shield) and other spares for boiler of unit no. 10 and 11 ph-iv, stps, mppgcl, sarni.

Procurement of various erosion protection sleeves (shield) and other spares for boiler of unit no. 10 and 11 ph-iv, stps, mppgcl, sarni.

Read more
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027

Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027

Read more
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027

Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027

Read more
Supply of erosion protection shield for back pass super heater front tubes

Supply of erosion protection shield for back pass super heater front tubes

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise