Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Flood Protection Work To Safeguard The Critical/ Vulnerable Spots At Belicharana U/S And D/S Of Stud Near Crusher On Left Side River Nikki Tawi At Spot ( Spot C)
|
| Description |
Construction Of Flood Protection Work To Safeguard The Critical/ Vulnerable Spots At Belicharana U/S And D/S Of Stud Near Crusher On Left Side River Nikki Tawi At Spot ( Spot C)
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_IFC_229167_10 |
|
Reference Number |
e-NIT NO.22 of 2023-24 |
| Tender Fee | 2000 |
| EMD | 41060 |
| Tender Value | - |
| Place | Executive Engineer FCD Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | September 09, 2023 21:30 |
| End Date |
Expired
25/09/2023
Expired 1078 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of flood protection work to safeguard the critical/ vulnerable spot at belicharana d/s crusher on left side of river nikki tawi (spot b)
Construction of flood protection work to safeguard the critical/ vulnerable spot at belicharana d/s crusher on left side of river nikki tawi (spot b)
Read moreConstruction of flood protection work to safeguard the critical/ vulnerable spot at belicharana d/s stud near crusher on left side of river nikki tawi (spot a)
Construction of flood protection work to safeguard the critical/ vulnerable spot at belicharana d/s stud near crusher on left side of river nikki tawi (spot a)
Read moreConstruction of flood protection work of revetment crates and earthen embankment to safeguard the critical/ vulnerable 8 spot at belicharana on left side of river nikki tawi (at spot)
Construction of flood protection work of revetment crates and earthen embankment to safeguard the critical/ vulnerable 8 spot at belicharana on left side of river nikki tawi (at spot)
Read moreConstruction of flood protection work at vulnerable spots from d/s of surya chak bridge to toph manhasan (ram bagh kullian/ dundhpur mukhra on right side of river nikki tawi (at spots)
Construction of flood protection work at vulnerable spots from d/s of surya chak bridge to toph manhasan (ram bagh kullian/ dundhpur mukhra on right side of river nikki tawi (at spots)
Read moreConstruction of flood protection work at vulnerable spots by way of construction of studs on right side of river nikki tawi at village rambagh (at spots) (stud no. 1and2)
Construction of flood protection work at vulnerable spots by way of construction of studs on right side of river nikki tawi at village rambagh (at spots) (stud no. 1and 2).
Read moreConstruction of flood protection work by way of stud to safeguard the defence infrastructure/ib fencing on right side of river nikki tawi at makwal spot 1
Construction of flood protection work by way of stud to safeguard the defence infrastructure/ib fencing on right side of river nikki tawi at makwal spot 1
Read moreConstruction of protection work on left side of river nikki tawi at firing range raipur satwari (at spot)
Construction of protection work on left side of river nikki tawi at firing range raipur satwari (at spot)
Read moreConstruction of flood protection work to safeguard the land/houses along nowshera tawi and adjoining nallah at spots.
Construction of flood protection work to safeguard the land/houses along nowshera tawi and adjoining nallah at spots.
Read moreConstruction of revetment crates along left side of nikki tawi at lalyal upstream lift irrigation scheme.(spot a) length 36m
Construction of revetment crates along left side of nikki tawi at lalyal upstream lift irrigation scheme.(spot a) length 36m
Read moreRestoration/construction of flood protection work on l/s of river nikki tawi from village lalyal to badyal brahmna (at spots) for the period of six months
Restoration/construction of flood protection work on l/s of river nikki tawi from village lalyal to badyal brahmna (at spots) for the period of six months
Read moreof your Industry type