Tender Details
Particulars | Details |
---|---|
Title |
Water Supply Scheme For Augmentation Of Uwss Jalore District Jalore Including 05 Years O And M After 01 Year Defect Liability Period Under Amrut 2
|
Description |
Water Supply Scheme For Augmentation Of Uwss Jalore District Jalore Including 05 Years O And M After 01 Year Defect Liability Period Under Amrut 2
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2025_PHCJA_457813_1 |
Reference Number |
NIB No 01/2025-26 ACE PHED Region Pali |
Tender Fee | 12500 |
EMD | 20.9 Lakh |
Tender Value | |
Place | Jalore |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=822413 |
Start Date | April 17, 2025 20:30 |
End Date |
30/04/2025 ( Expired 37 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type