Tender Details

Particulars Details
Title
Construction Of Precast Boundary Wall Length Approx 750 M And Earth Filling Work For Proposed Cbg Plant At Jorhat Including Construction Of Road From Main Road To Cbg Plant At Jorhat Approx. 380 M Length
Description
Construction Of Precast Boundary Wall Length Approx 750 M And Earth Filling Work For Proposed Cbg Plant At Jorhat Including Construction Of Road From Main Road To Cbg Plant At Jorhat Approx. 380 M Length
Organisation Oil India Limited | Public Sector Undertakings
Tender Id T1607591
Reference
Number
CGI9827P26
Tender Fee 0
EMD 2.94 Lakh
Tender Value -
Place CIVIL PHQ
Link
View Original Tender Notice

https://www.oil-india.com/download-tender-document?detail=NlVLMXZDckw0bDJnMmdxcGpZbVVuSlJvcFE9PQ%3D%3D

Start Date August 04, 2025 22:30
End Date
Expired 02/09/2025

Expired 412 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.

Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.

Read more
Supply and filling good earth suitable for plantation in between 4-lane road and railway siding area (approx 15.00 hectare) at dvc, rtps.

Supply and filling good earth suitable for plantation in between 4-lane road and railway siding area (approx 15.00 hectare) at dvc, rtps.

Read more
Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division

Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division

Read more
Cs for prep of feasibility report and dpr for development of the bhopal sagar kabrai corridor length 380 km approx. as an ac corridor in the states of madhya pradesh and uttar pradesh.

Cs for prep of feasibility report and dpr for development of the bhopal sagar kabrai corridor length 380 km approx. as an ac corridor in the states of madhya pradesh and uttar pradesh.

Read more
Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station

Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station

Read more
Construction of high level platform, station building, submersible pump, side drain and road in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.

Construction of high level platform, station building, submersible pump, side drain and road in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.

Read more
Execution of p way work and construction of rcc box bridge with jacketing in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.

Execution of p way work and construction of rcc box bridge with jacketing in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.

Read more
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc

Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise