Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Precast Boundary Wall Length Approx 750 M And Earth Filling Work For Proposed Cbg Plant At Jorhat Including Construction Of Road From Main Road To Cbg Plant At Jorhat Approx. 380 M Length
|
| Description |
Construction Of Precast Boundary Wall Length Approx 750 M And Earth Filling Work For Proposed Cbg Plant At Jorhat Including Construction Of Road From Main Road To Cbg Plant At Jorhat Approx. 380 M Length
|
| Organisation | Oil India Limited | Public Sector Undertakings |
| Tender Id | T1607591 |
|
Reference Number |
CGI9827P26 |
| Tender Fee | 0 |
| EMD | 2.94 Lakh |
| Tender Value | - |
| Place | CIVIL PHQ |
| Link |
View Original Tender Notice
https://www.oil-india.com/download-tender-document?detail=NlVLMXZDckw0bDJnMmdxcGpZbVVuSlJvcFE9PQ%3D%3D |
| Start Date | August 04, 2025 22:30 |
| End Date |
Expired
02/09/2025
Expired 412 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.
Read moreSupply and filling good earth suitable for plantation in between 4-lane road and railway siding area (approx 15.00 hectare) at dvc, rtps.
Supply and filling good earth suitable for plantation in between 4-lane road and railway siding area (approx 15.00 hectare) at dvc, rtps.
Read moreOhe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Read moreCs for prep of feasibility report and dpr for development of the bhopal sagar kabrai corridor length 380 km approx. as an ac corridor in the states of madhya pradesh and uttar pradesh.
Cs for prep of feasibility report and dpr for development of the bhopal sagar kabrai corridor length 380 km approx. as an ac corridor in the states of madhya pradesh and uttar pradesh.
Read moreConstruction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station
Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station
Read moreConstruction of high level platform, station building, submersible pump, side drain and road in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.
Construction of high level platform, station building, submersible pump, side drain and road in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.
Read moreExecution of p way work and construction of rcc box bridge with jacketing in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.
Execution of p way work and construction of rcc box bridge with jacketing in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.
Read moreSw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Read moreEarth filling in proposed rehabilitation area at technopark phase iii campus, trivandrum
Earth filling in proposed rehabilitation area
Read moreof your Industry type