Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Approach Road, Additional Approach Road And Protection Work Yamuna River Bridge Malav Aligarh
|
Description |
Construction Of Approach Road, Additional Approach Road And Protection Work Of 2 Lane Bridge At Over Yamuna River Hasanpur District Palwal (Haryana) To Malav District Aligarh (Between Uttar Pradesh) Marg In District Aligarh (U.P.)
|
Organisation | UP STATE BRIDGE CORPORATION LIMITED | State Govt. and UT |
Tender Id | 2025_UPSBC_1037351_1 |
Reference Number |
201/ET/CPM(Agra)/2025-26 Date 06.05.2025 |
Tender Fee | 20000 |
EMD | 82.3 Lakh |
Tender Value | |
Place | Malav Aligarh |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1879630 |
Start Date | May 08, 2025 19:30 |
End Date |
29/05/2025 ( Expired 14 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreDoor to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of construction of road from kharsang miao vijaynagar section of frontier highway nh 913 km 0.000 to 81.400 81.400km
Consultancy services for authoritys engineer for supervision of construction of road from kharsang miao vijaynagar section of frontier highway nh 913 km 0.000 to 81.400 81.400km
Read moreof your Industry type