Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Toe Wall Along Ob Dump Of Kabribad Oc Mine Under Giridih Area
|
| Description |
Construction Of Toe Wall Along Ob Dump Of Kabribad Oc Mine Under Giridih Area
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_327960_1 |
|
Reference Number |
GM(G)/SO(C)/E-tender /2024-25/118 Dt. 05.02.25 |
| Tender Fee | 0 |
| EMD | 1.3 Lakh |
| Tender Value | - |
| Place | Giridih |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339945 |
| Start Date | February 06, 2025 15:30 |
| End Date |
Expired
21/02/2025
Expired 599 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing and fixing chain link mesh fencing around ob and oc type quarters at mppmcl rampur jabalpur
Providing and fixing chain link mesh fencing around ob and oc type quarters at mppmcl rampur jabalpur
Read moreProviding barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.
Providing barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.
Read moreConstruction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreConcreting for rain water harvesting at khadki sports complex hockey ground along h. no. 469 ob and 470 ob ii call
Concreting for rain water harvesting at khadki sports complex hockey ground along h. no. 469 ob and 470 ob ii call
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreEstablishment of creche facility to female employees at nmug to oc mine under new majri sub area of majri area.
Establishment of creche facility to female employees at nmug to oc mine under new majri sub area of majri area.
Read moreRestoration of lis rattanpur paras by way of providing toe/retaining wall along with the local nallah (choi).
Restoration of lis rattanpur paras by way of providing toe/retaining wall along with the local nallah (choi).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreDevelopment of 02 nos. bio-toilets at bhanegaon ocm and 2 no. bio toilets at singhori deep oc mine including maintenance for 2 years under bssa.
Development of 02 nos. bio-toilets at bhanegaon ocm and 2 no. bio toilets at singhori deep oc mine including maintenance for 2 years under bssa.
Read moreof your Industry type