Tender Details

Particulars Details
Title
Construction Of Toe Wall Along Ob Dump Of Kabribad Oc Mine Under Giridih Area
Description
Construction Of Toe Wall Along Ob Dump Of Kabribad Oc Mine Under Giridih Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_327960_1
Reference
Number
GM(G)/SO(C)/E-tender /2024-25/118 Dt. 05.02.25
Tender Fee 0
EMD 1.3 Lakh
Tender Value -
Place Giridih
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339945

Start Date February 06, 2025 15:30
End Date
Expired 21/02/2025

Expired 599 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing and fixing chain link mesh fencing around ob and oc type quarters at mppmcl rampur jabalpur

Providing and fixing chain link mesh fencing around ob and oc type quarters at mppmcl rampur jabalpur

Read more
Providing barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.

Providing barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.

Read more
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area

Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area

Read more
Concreting for rain water harvesting at khadki sports complex hockey ground along h. no. 469 ob and 470 ob ii call

Concreting for rain water harvesting at khadki sports complex hockey ground along h. no. 469 ob and 470 ob ii call

Read more
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Read more
Establishment of creche facility to female employees at nmug to oc mine under new majri sub area of majri area.

Establishment of creche facility to female employees at nmug to oc mine under new majri sub area of majri area.

Read more
Restoration of lis rattanpur paras by way of providing toe/retaining wall along with the local nallah (choi).

Restoration of lis rattanpur paras by way of providing toe/retaining wall along with the local nallah (choi).

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Development of 02 nos. bio-toilets at bhanegaon ocm and 2 no. bio toilets at singhori deep oc mine including maintenance for 2 years under bssa.

Development of 02 nos. bio-toilets at bhanegaon ocm and 2 no. bio toilets at singhori deep oc mine including maintenance for 2 years under bssa.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise