Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvments Of Burial Ground With Waiting Shed, Compound Wall , Cc Road And Hand Pump At Viyalanoor Village In Ad Colony At Velarenthal Panchayat
|
Description |
Improvments Of Burial Ground With Waiting Shed, Compound Wall , Cc Road And Hand Pump At Viyalanoor Village In Ad Colony At Velarenthal Panchayat
|
Organisation | Rural Development and Panchayat Raj Department | State Govt. and UT |
Tender Id | 2025_RDTN_567333_1 |
Reference Number |
Improvments of Burial Ground with Waiting Shed, Compound Wall , CC Road and Hand Pump at Viyalan |
Tender Fee | 0 |
EMD | 12500 |
Tender Value | |
Place | kalaiyar koil |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=677347 |
Start Date | June 11, 2025 21:00 |
End Date |
12/06/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreRepairs to hardstanding, path, interlocking tiles, chequered tiles, perimeter compound wall, security fencing, barbed wire, security gates, baby wall, temproary sheds at various loc of nad expl, non expl and tunir area under age b/r-ii at ns karanja
Repairs to hardstanding, path, interlocking tiles, chequered tiles, perimeter compound wall, security fencing, barbed wire, security gates, baby wall, temproary sheds at various loc of nad expl, non expl and tunir area under age b/r-ii at ns karanja
Read moreConstruction of cc road at ramsiya shakya house to gov. school and p.n. verma house ward no.22 zone no.10.file no.44/25x3/6.
Construction of cc road at ramsiya shakya house to gov. school and p.n. verma house ward no.22 zone no.10.file no.44/25x3/6.
Read moreConstruction of cc road at sheetal garden to ball shamshan in pragati vihar colony ram gopal baba ward no.22 zone no.10.file no.43/25x3/6.
Construction of cc road at sheetal garden to ball shamshan in pragati vihar colony ram gopal baba ward no.22 zone no.10.file no.43/25x3/6.
Read moreof your Industry type