Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Setting Of Bess System
|
| Description |
Setting Up Of 90 Mw/225 Mwh Battery Energy Storage System (Bess) Near Chilla S/S Chilla Hep Distt Pauri Garhwal To Be Connected On 132 Kv Grid Connecting S/S Chilla, Distt. Pauri Garhwal, Uttarakhand
|
| Organisation | MD- UJVN | Director (Project) | DGM (Solar) | EE (Solar) |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 15.99 Lakh |
| EMD | 4.5 Crore |
| Tender Value | 352.3 Crore |
| Place | Uttarakhand |
| Link | Login to view |
| Start Date | August 04, 2026 21:30 |
| End Date |
Closing soon
14/10/2026
1 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Read moreRfp for approx 2mw with bess pv plant valsad dist milk producers union limited nagpur
Rfp for approx 2mw with bess pv plant valsad dist milk producers union limited nagpur
Read moreEpc package for bess (400mwh) implementation at ntpc mouda-bidding doc no cs-9575- 171c-9
Epc package for bess (400mwh) implementation at ntpc mouda-bidding doc no cs-9575- 171c-9
Read moreNit for consultancy firm for feasibility study for bess and dpr for battery bank system for ktps
Nit for consultancy firm for feasibility study for bess and dpr for battery bank system for ktps
Read moreNit no. wbsedcl/spgd/ jungle sundari karmanagari ii/solar pv and bess project /2026-27/nit-89 date 12.10.2026
Design, engineering, procurement, supply, installation, construction, testing and commissioning incl warrantee obligation, o and m for 12 yr of a 50 mw ac solar pv power plant and 10 mw/ 40 mwh bess located at jungle sundari, purulia district, wb
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreSetting up of ev charging stations
Setting up of ev charging stations at agcl multi-fuel retail outlets
Read moreDesign, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Design, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Read moreFast set resin capsule,slow setting resin capsule
Fast set resin capsule,slow setting resin capsule
Read moreSetting up of effluents characterization facility for demil plant
Setting up of effluents characterization facility for demil plant
Read moreof your Industry type