Tender Details
Particulars | Details |
---|---|
Title |
Urgent Fdr Of Road From Kanchanpur To Jalabassa Road (Near Santipur Dtw) Under Jampui Hill Sub Division, Pwd(rn B) During The Year 2024 2025 Sh Wbm, Pile Work, Rcc Protection Wall At Ch 3.90 Km, Length 18.30 Mtr, Gr Ii.
|
Description |
Urgent Fdr Of Road From Kanchanpur To Jalabassa Road (Near Santipur Dtw) Under Jampui Hill Sub Division, Pwd(rn B) During The Year 2024 2025 Sh Wbm, Pile Work, Rcc Protection Wall At Ch 3.90 Km, Length 18.30 Mtr, Gr Ii.
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2024_CEPWD_56370_1 |
Reference Number |
175/EE/KCP/2024-25 |
Tender Fee | 1000 |
EMD | 48517 |
Tender Value | |
Place | Kanchanpur |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=57288 |
Start Date | January 01, 2025 15:30 |
End Date |
06/01/2025 ( Expired 132 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pr of road from hazibari school to joyganti school l 0 85 km under the jurisdiction of ganganagar pwd sub division during the year 2025 26 sh stripping pcc work katcha drain wbm tack coat carpetting seal coat etc gr ii
Pr of road from hazibari school to joyganti school l 0 85 km under the jurisdiction of ganganagar pwd sub division during the year 2025 26 sh stripping pcc work katcha drain wbm tack coat carpetting seal coat etc gr ii
Read morePr of road from hazibari school to joyganti school l 1 20 km under the jurisdiction of ganganagar pwd sub division during the year 2025 26 sh stripping katcha drain grouting tack coat carpeting seal coat etc gr i
Pr of road from hazibari school to joyganti school l 1 20 km under the jurisdiction of ganganagar pwd sub division during the year 2025 26 sh stripping katcha drain grouting tack coat carpeting seal coat etc gr i
Read moreFdr / mtc. of road from natun bazar tehsil office to hanging bridge via madhan mohan ashram at ch. 0.00 km to 0.70 km (l- 700.00 mtr ) under jatanbari pwd(randb) sub-division / sh- throughout re-carpeting (l-0.700 km) , sand seal coating, wbm gr-3
Fdr / mtc. of road from natun bazar tehsil office to hanging bridge via madhan mohan ashram at ch. 0.00 km to 0.70 km (l- 700.00 mtr ) under jatanbari pwd(randb) sub-division / sh- throughout re-carpeting (l-0.700 km) , sand seal coating, wbm gr-3
Read moreMtc of road from kowai chowmuhani simna road (at mantala shib mandir) to patanjali camp under mohanpur r.d block during the year 2024-25/sh gsb, wbm-iii, carpeting, drain , cd and earth filling etc(l-0.150 km)(ch 150.00 to 360.00 mtr)/gr-ii
Mtc of road from kowai chowmuhani simna road (at mantala shib mandir) to patanjali camp under mohanpur r.d block during the year 2024-25/sh gsb, wbm-iii, carpeting, drain , cd and earth filling etc(l-0.150 km)(ch 150.00 to 360.00 mtr)/gr-ii
Read moreMaintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 0.00 to 1.40 km)/gr-i
Maintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 0.00 to 1.40 km)/gr-i
Read moreMaintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 1.40 km to 2.80 km)/gr-ii
Maintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 1.40 km to 2.80 km)/gr-ii
Read morePeriodical renewal of pwd road from dasherghat to gairing para(l-1.8km) during the year 2024-25/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.00km to 0.90km(gr-i).
Periodical renewal of pwd road from dasherghat to gairing para(l-1.8km) during the year 2024-25/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.00km to 0.90km(gr-i).
Read morePeriodical renewal of pwd road from dasherghat to gairing para(l-1.8km) during the year 2024-25/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.90km to 1.80km(gr-ii).
Periodical renewal of pwd road from dasherghat to gairing para(l-1.8km) during the year 2024-25/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.90km to 1.80km(gr-ii).
Read moreFdr/urgent mtc. of different roads under kakraban pwd(rnb) sub-division during the year 2025-26/sh patch carpeting, patch seal coating,protection work,cleaning of land slide, maintenace of earthen shoulder, surface drain etc. (gr-ii)
Fdr/urgent mtc. of different roads under kakraban pwd(rnb) sub-division during the year 2025-26/sh patch carpeting, patch seal coating,protection work,cleaning of land slide, maintenace of earthen shoulder, surface drain etc. (gr-ii)
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreof your Industry type