Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Riding Quality Work Of Budhai (Pwd Road) To Bihar Border Via Jamua (Total Length 9.90 Km) Under Road Division Deoghar
|
Description |
Improvement Of Riding Quality Work Of Budhai (Pwd Road) To Bihar Border Via Jamua (Total Length 9.90 Km) Under Road Division Deoghar
|
Organisation | RCD EinC | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 7.58 Lakh |
Tender Value | |
Place | Budhai (PWD Road) to Bihar Border |
Link |
AAAAAAAAAA Login to view |
Start Date | November 29, 2024 16:00 |
End Date |
12/12/2024 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for ae for supervision of balance work of 4lane with paved shoulder configuration of the highway ing from km88.400 (savali vihir) to km163.400 (ahmednagar bypass)(length 75.000 km) section of nh-160 in maharashtra under bmp on epc mode
Cs for ae for supervision of balance work of 4lane with paved shoulder configuration of the highway ing from km88.400 (savali vihir) to km163.400 (ahmednagar bypass)(length 75.000 km) section of nh-160 in maharashtra under bmp on epc mode
Read moreIe services for construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh146b from design km 0.000 to design km 43.250 (design length 43.250 km) in madhya pradesh on hybrid annuity mode under nh (o) scheme.
Ie services for construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh146b from design km 0.000 to design km 43.250 (design length 43.250 km) in madhya pradesh on hybrid annuity mode under nh (o) scheme.
Read moreUtility shifting of pipe line for aiims salawas road widening work from sangriya fanta to nandwan esr under phed sub dn luni (4.50 km to 15.00 km) under pwd deposit work
Utility shifting of pipe line for aiims salawas road widening work from sangriya fanta to nandwan esr under phed sub dn luni (4.50 km to 15.00 km) under pwd deposit work
Read moreWhite topping pavement works on bharhut hotal to court road and over bridhe to court road at civil line satna length 1.00 km under sub division satna
White topping pavement works on bharhut hotal to court road and over bridhe to court road at civil line satna length 1.00 km under sub division satna
Read moreImprovement of road from purba laxmibill to nabasantiganj under bishalgarh block, sepahijala district, tripura (l_9 point 80 km) (2nd call)
Improvement of road from purba laxmibill to nabasantiganj under bishalgarh block, sepahijala district, tripura (l_9 point 80 km) (2nd call)
Read moreShort term maintenance of nh167k from km 186.0 to 216.4 of nandyal to kurnool kadapa border road in r and b aprdc division, kurnool
Short term maintenance of nh167k from km 186.0 to 216.4 of nandyal to kurnool kadapa border road in r and b aprdc division, kurnool
Read moreShort term maintenance of nh167k from km 216.4 - 250.0 of nandyal to kurnool kadapa border road in r and b aprdc division, kurnool
Short term maintenance of nh167k from km 216.4 - 250.0 of nandyal to kurnool kadapa border road in r and b aprdc division, kurnool
Read moreShort term maintenance of ap and knk border to gooty section road of nh-67 from km 372.200 to 402.000, km. 420.800 to 424.225 for the badly damaged stretches including leftover bypassed stretch of guntakal town and gooty town in r and b nh division a
Short term maintenance of ap and knk border to gooty section road of nh-67 from km 372.200 to 402.000, km. 420.800 to 424.225 for the badly damaged stretches including leftover bypassed stretch of guntakal town and gooty town in r and b nh division a
Read moreIrqp (improvement of riding quality) work of dumka -masalia-kundhit -nala road from km 20.00 to 53.355(total length- 33.355 km) under road division, jamtara for the year 2024-25
Irqp (improvement of riding quality) work of dumka -masalia-kundhit -nala road from km 20.00 to 53.355(total length- 33.355 km) under road division, jamtara for the year 2024-25
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreof your Industry type