Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Carrying Out Bullet Cleaning By Specially Designed Phosphor Bronze Bullet Shot Of Lhs Rhs Of Condenser Tubes In Unit I Condenser During Aoh Of 2025 26
|
Description |
Mtps I Tm Carrying Out Bullet Cleaning By Specially Designed Phosphor Bronze Bullet Shot Of Lhs Rhs Of Condenser Tubes In Unit I Condenser During Aoh Of 2025 26
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_554822_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 71 / 2025-26 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=662619 |
Start Date | May 06, 2025 17:30 |
End Date |
20/05/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Condenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Condenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Read moreMtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Read moreMtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Mtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtpsi mill plant unit i overhauling of classifier assemblies replacement repairing of eroded cone cone drum section venture vanes venturi collars during aoh 2025 26
Mtpsi mill plant unit i overhauling of classifier assemblies replacement repairing of eroded cone cone drum section venture vanes venturi collars during aoh 2025 26
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreof your Industry type