Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Biennial Maintenance Of Cycle Track, Horticulture Work, Walkway, Service Road Along Trunk Mains Developed In Phase I, Phase Iia And Phase Iib Under H.E
|
| Description |
Biennial Maintenance Of Cycle Track, Horticulture Work, Walkway, Service Road Along Trunk Mains Developed In Phase I, Phase Iia And Phase Iib Under H.E.
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2025_MCGM_1133722_1 |
|
Reference Number |
Biennial Maint of Cycle Track |
| Tender Fee | 19970 |
| EMD | 14.84 Lakh |
| Tender Value | |
| Place | Mulund to Mahim - Sion |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1977370 |
| Start Date | January 08, 2025 16:30 |
| End Date |
Expired
21/01/2025
Expired 500 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Biennial maintenance contract of central ac system for stage-ii and stage-iii under emiph-i dept, sgtpp.
Biennial maintenance contract of central ac system for stage-ii and stage-iii under emiph-i dept, sgtpp.
Read moreWork of repair and maintenance of pipe line along with road restoration work under rnd sub. division beawar in the jurisdiction of division beawar
Work of repair and maintenance of pipe line along with road restoration work under rnd sub. division beawar in the jurisdiction of division beawar
Read moreAnnual maintenance of horticulture work including trees/ shrubs plant etc. in water work-3, 5 and 7 at imt manesar
Annual maintenance of horticulture work including trees/ shrubs plant etc. in water work-3, 5 and 7 at imt manesar
Read moreUpgradation and beautification of chaudhary brahm prakash chowk and surrounding islands on pusa road, new delhi under sub-division-iii, swr-i, pwd (gnctd) (sh civil, electrical and horticulture works) (balance work)
Upgradation and beautification of chaudhary brahm prakash chowk and surrounding islands on pusa road, new delhi under sub-division-iii, swr-i, pwd (gnctd) (sh civil, electrical and horticulture works) (balance work)
Read moreTo achieve the target of tree plantation year 202627 work of tree plantation in gap filling along the service road of inner ring road.
To achieve the target of tree plantation year 202627 work of tree plantation in gap filling along the service road of inner ring road.
Read moreMaintenance of horticulture work in gandhi road both side raja mansingh chouraha to balwant nagar tiraha nagar nigam gwalior 03 year. file no. 28/26x13/1
Maintenance of horticulture work in gandhi road both side raja mansingh chouraha to balwant nagar tiraha nagar nigam gwalior 03 year. file no. 28/26x13/1
Read moreAr and mo rural road under sd-iii, baratang of cd-i, apwd, rangat. sw-providing the service of un-skilled labour for up-keep and maintenance of various works under sd-iii, baratang of cd-i, apwd, rangat.
Ar and mo rural road under sd-iii, baratang of cd-i, apwd, rangat. sw-providing the service of un-skilled labour for up-keep and maintenance of various works under sd-iii, baratang of cd-i, apwd, rangat.
Read moreConstruction of cement concrete track after dismantling existing damaged paver track in park near h. no. 1005, sector 21, chandigarh and repair of damaged track in park on sector 18c-sector 19d v3 road, chandigarh, under wdf.
Construction of cement concrete track after dismantling existing damaged paver track in park near h. no. 1005, sector 21, chandigarh and repair of damaged track in park on sector 18c-sector 19d v3 road, chandigarh, under wdf.
Read moreConstruction of 50 bedded ayush hospital at junglighat, under sd-i, pbnd, apwd, port blair. phase-ii i/c iei in epc mode-i design and build basis
Construction of 50 bedded ayush hospital at junglighat, under sd-i, pbnd, apwd, port blair. phase-ii i/c iei in epc mode-i design and build basis
Read moreUnder khargapur saraswan ward, construction work of side track interlocking rcc road and drain from arjunganj sultanpur main road to gaurav agarwal house and in front of amit rai house.
Under khargapur saraswan ward, construction work of side track interlocking rcc road and drain from arjunganj sultanpur main road to gaurav agarwal house and in front of amit rai house.
Read moreof your Industry type