Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Delivery, Installation And Commissioning Of Counter Flow Type Cooling Tower.
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/5147127 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 31, 2024 20:57 |
| End Date |
Expired
21/08/2024
Expired 755 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Establishment of advanced semiconductor processing cleanroom facility on turnkey basis including design, engineering, supply, installation, integration and commissioning in dept. of electronics engineering, iit(bhu), varanasi.
Establishment of advanced semiconductor processing cleanroom facility on turnkey basis including design, engineering, supply, installation, integration and commissioning in dept. of electronics engineering, iit(bhu), varanasi.
Read moreSupply, installation, commissioning and maintainance of x-ray baggage inspection system at various prisons in the state
Supply, installation, commissioning and maintainance of x-ray baggage inspection system at various prisons in the state
Read moreSupply, installation, commissioning and maintenance of ai compatible ip based cctv surveillance system to various prisons in the state
Supply, installation, commissioning and maintenance of ai compatible ip based cctv surveillance system to various prisons in the state
Read moreSupply, installation and commissioning of induced draught counter flow cooling tower as per spec.
Read more
Erection installation commissioning of induced draft cross flow cooling tower
Erection installation commissioning of induced draft cross flow cooling tower
Read morePultruded frp structure cooling tower (counter flow design),ware house spares for 2 years of operat
Read more
of your Industry type