Tender Details

Particulars Details
Title
Analytical Balance
Description
Organisation Department of Pharmaceuticals | Ministry of Chemicals and Fertilizers
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date May 23, 2025 18:30
End Date

13/06/2025 ( 3 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 1 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: Abhisek Mandal
Address: Abhisek Mandal,[email protected],National Institute of Pharmaceutical Education and Research& NIPER Kolkata Chunilal Bhawan & Adjacent to BCPL,168, Maniktala Main Road, Kolkata-700054,CALCUTTA NORTH DIVISION,WEST BENGAL,700054,India,0983-2287099-
Ministry: Ministry Of Chemicals And Fertilizers
Department: Department Of Pharmaceuticals
Organisation: National Institute Of Pharmaceutical Education And Research (niper) Kolkata
Office Address: Kolkata
Similar Tenders
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
08/6-a/nit dt. 06-06-2025 new complex balance work

Construction of new administrative complex of water resources department at amritsar (punjab) balance work

Read more
Procurement of essential equipment i.e., analytical balance, de-humidifier, muffle furnace, hot air oven and hot plate along with installation and commissioning at coal testing laboratory, stps, mppgcl, sarni.

Procurement of essential equipment i.e., analytical balance, de-humidifier, muffle furnace, hot air oven and hot plate along with installation and commissioning at coal testing laboratory, stps, mppgcl, sarni.

Read more
Completion of balance works of construction of store complex including connecting roads at 765/400/220 kv fatehgarh-ii substation.

Completion of balance works of construction of store complex including connecting roads at 765/400/220 kv fatehgarh-ii substation.

Read more
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.

Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.

Read more
Supply and delivery of lab vehicles, medical and analytical equipment

Supply and delivery of lab vehicles, medical and analytical equipment

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise