Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Fin Bar Material For Water Wall Tubes Of 1x500 Mw Boiler
|
| Description |
Supply Of Fin Bar Material For Water Wall Tubes Of 1x500 Mw Boiler
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 621616 |
|
Reference Number |
NIT-211/2025-26/CE/OM/KTPP/BMD-I |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | August 13, 2025 16:00 |
| End Date |
Expired
28/08/2025
Expired 411 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of cold end gratings for aph of 1x500mw boiler
Supply of cold end gratings for aph of 1x500mw boiler
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreProcurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Procurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreBmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27
Bmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Read moreof your Industry type